Spillway design - step by step /

Most dam accidents with hydroelectric plants are due to under-dimensioning of the maximum floods of spillway design, causing extravasation and dam breaks (this occurs in 23% of the accidents). This work highlights the relationship between spillway design and potential dam failure and other important...

Full description

Bibliographic Details
Main Author: Magela Pereira, Geraldo (Author)
Corporate Author: Taylor & Francis
Format: eBook
Language:English
Published: London : CRC Press, 2020.
Subjects:
Online Access:Connect to the full text of this electronic book

Internet

Connect to the full text of this electronic book

Available Online

Holdings details from Available Online
Call Number: TC555 .M34 2020eb
 
Call Number Status Get It
TC555 .M34 2020eb Available