Practices for steel bridge fabrication and erection tolerances /

There are a variety of ways to achieve tolerances in steel bridge fabrication and erection. One common method is to use shop assembly, which is the process of assembling steel members in the shop before they are erected on site. Another method is to use oversize holes, which are holes that are sligh...

Full description

Bibliographic Details
Main Author: Medlock, Ronald D. (Author)
Corporate Authors: American Association of State Highway and Transportation Officials (sponsoring body.), United States. Federal Highway Administration (sponsoring body.)
Format: Book
Language:English
Published: Washington, D.C. : Transportation Research Board, [2023].
Series:Synthesis of highway practice ; 603.
Subjects:

Evans: Library Stacks

Holdings details from Evans: Library Stacks
Call Number: TG350 .M43 2023
 
Call Number Status Get It
TG350 .M43 2023 Available