TxDOT Project 0-6955: development of a strategy to address load posted bridges through reduction in uncertainty in load ratings : TxDOT workshop, October 7, 2019, Austin TX.

Images of slides presented at a Texas Department of Transportation workshop. Includes findings of a three-part study (Project 0-6955) performed by the Texas A&M Transportation Institute in cooperation with the Texas Department of Transportation and the Federal Highway Administration. In this s...

Full description

Bibliographic Details
Corporate Authors: Texas. Department of Transportation. Research and Technology Implementation Office (sponsoring body.), United States. Federal Highway Administration (sponsoring body.)
Format: eBook
Language:English
Published: College Station, Texas : Texas A&M Transportation Institute : Texas A&M University, Zachry Department of Civil & Environmental Engineering, [2019]
Series:Research report (Austin, Tex.) ; 0-6955-P1.
Subjects:
Online Access:Connect to the full text of this presentation
Connect to the project summary

Internet

Connect to the full text of this presentation
Connect to the project summary

Available Online

Holdings details from Available Online
Call Number: HE203 .T43 no .0-6955-P1
 
Call Number Status Get It
HE203 .T43 no .0-6955-P1 Available