Design and construction of deck bulb tee girder bridges with UHPC connections /
The advantage of prestressed concrete deck bulb tee (DBT) girder bridges is the speed of construction, since no separate decking is required. However, the performance of the connection between girders has been a primary concern. The TRB National Cooperative Highway Research Program's NCHRP Rese...
| Main Author: | |
|---|---|
| Corporate Authors: | , |
| Format: | Book |
| Language: | English |
| Published: |
Washington, DC :
Transportation Research Board,
2022.
|
| Series: | Report (National Cooperative Highway Research Program ;
999. |
| Subjects: | |
| Online Access: | View Report |
Internet
View ReportEvans: Library Stacks
| Call Number: |
TE7 N25 no.999 |
|
|---|---|---|
| Call Number | Status | Get It |
| TE7 N25 no.999 | Available | |