Systematic approach for determining construction contract time : a guidebook /

Contract time affects the cost of construction, traffic disruption and public inconvenience, the economic impact of projects to the surrounding areas, and schedule risks. The TRB National Cooperative Highway Research Program's NCHRP Research Report 979: Systematic Approach for Determining Const...

Full description

Bibliographic Details
Main Author: Jeong, H. David (Author)
Corporate Authors: American Association of State Highway and Transportation Officials (sponsoring body.), United States. Federal Highway Administration (sponsoring body.)
Format: Book
Language:English
Published: Washington, DC : Transportation Research Board, 2022.
Series:Report (National Cooperative Highway Research Program) ; ‡v ; 979.
Subjects:
Online Access:Email address required to view/download the free text.
Description
Summary:Contract time affects the cost of construction, traffic disruption and public inconvenience, the economic impact of projects to the surrounding areas, and schedule risks. The TRB National Cooperative Highway Research Program's NCHRP Research Report 979: Systematic Approach for Determining Construction Contract Time: A Guidebook provides state departments of transportation guidance for producing consistently credible, reliable, and defensible contract time estimates. Supplemental to the report is NCHRP Web-Only Document 298: Developing a Systematic Approach for Determining Construction Contract Time, a spreadsheet-based Toolkit, a Technical Memorandum, and a Presentation.
Item Description:At head of title: National Cooperative Highway Research Program.
Physical Description:123 pages, 47 variously numbered pages : illustrations ; 28 cm
Bibliography:Includes bibliographical references and appendices.
ISBN:9780309094634
0309094631
ISSN:2572-3766 ;
DOI:10.17226/26537