Systematic approach for determining construction contract time : a guidebook /

Contract time affects the cost of construction, traffic disruption and public inconvenience, the economic impact of projects to the surrounding areas, and schedule risks. The TRB National Cooperative Highway Research Program's NCHRP Research Report 979: Systematic Approach for Determining Const...

Full description

Bibliographic Details
Main Author: Jeong, H. David (Author)
Corporate Authors: American Association of State Highway and Transportation Officials (sponsoring body.), United States. Federal Highway Administration (sponsoring body.)
Format: Book
Language:English
Published: Washington, DC : Transportation Research Board, 2022.
Series:Report (National Cooperative Highway Research Program) ; ‡v ; 979.
Subjects:
Online Access:Email address required to view/download the free text.

Internet

Email address required to view/download the free text.

Evans: Library Stacks

Holdings details from Evans: Library Stacks
Call Number: TE7 N25 no.979
 
Call Number Status Get It
TE7 N25 no.979 Available