Design for improved submarine tunnel, comprising brick arch within cast or wrought iron skin, laid in trench dredged for that purpose [first proposed in 1868 for crossing Boston Harbor].

Bibliographic Details
Corporate Author: United States. Army. Corps of Engineers
Other Authors: Foster, J. G. (Bvt. Maj. Gen.)
Format: Government Document eBook
Language:English
Published: Washington, DC : [publisher not identified], 1872.
Subjects:
Online Access:Connect to the full text of this electronic document

Internet

Connect to the full text of this electronic document

Available Online

Holdings details from Available Online
 
Call Number Status Get It
Available