Time-To-Build : Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries /

As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are indu...

Full description

Bibliographic Details
Main Author: Peeters, Marga
Corporate Author: SpringerLink (Online service)
Format: eBook
Language:English
Published: Berlin, Heidelberg : Springer Berlin Heidelberg, 1995.
Series:Lecture notes in economics and mathematical systems ; 420.
Subjects:
Online Access:Connect to the full text of this electronic book
Description
Summary:As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.
Item Description:Electronic resource.
Physical Description:1 online resource (ix, 204 pages)
ISBN:9783642468155 (electronic bk.)
3642468152 (electronic bk.)
ISSN:0075-8442 ;