Time-To-Build : Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries /

As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are indu...

Full description

Bibliographic Details
Main Author: Peeters, Marga
Corporate Author: SpringerLink (Online service)
Format: eBook
Language:English
Published: Berlin, Heidelberg : Springer Berlin Heidelberg, 1995.
Series:Lecture notes in economics and mathematical systems ; 420.
Subjects:
Online Access:Connect to the full text of this electronic book

Internet

Connect to the full text of this electronic book

Available Online

Holdings details from Available Online
Call Number: HB1-846.8
 
Call Number Status Get It
HB1-846.8 Available