Project Scheduling with Time Windows and Scarce Resources : Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions /
The book presents the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints (arising from minimum and maximum time lags between project activities) and several different types of limited resources are considered. A large variety of...
| Main Author: | |
|---|---|
| Corporate Author: | |
| Other Authors: | , |
| Format: | eBook |
| Language: | English |
| Published: |
Berlin, Heidelberg :
Springer Berlin Heidelberg,
2003.
|
| Edition: | Second Edition. |
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
Internet
Connect to the full text of this electronic bookAvailable Online
| Call Number: |
HD30.23 |
|
|---|---|---|
| Call Number | Status | Get It |
| HD30.23 | Available | |