Multi-level lot sizing and scheduling : methods for capacitated, dynamic, and deterministic models /
The logic of Manufacturing Resource Planning (MRP II) which is implemented in most modern production planning and control systems does not provide any satisfying solutions for multi-level lot sizing, especially not, when capacity is scare. Moreover, lot size and sequence decisions are usually not in...
| Main Author: | |
|---|---|
| Corporate Author: | |
| Format: | eBook |
| Language: | English |
| Published: |
Heidelberg :
Physica-Verlag,
[1997]
|
| Series: | Production and logistics.
|
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
Internet
Connect to the full text of this electronic bookAvailable Online
| Call Number: |
TS162 .K56 1997 |
|
|---|---|---|
| Call Number | Status | Get It |
| TS162 .K56 1997 | Available | |