Proposed Arrangements for Electric Generating Facilities at Hanford New Production Reactor : hearings before the United States Joint Committee on Atomic Energy, Eighty-Seventh Congress, second session, on Sept. 27, 1962.
Reviews proposed contract between AEC, Bonneville Power Administration and Washington State Public Power System for construction and operation of the Hanford nuclear reactor.
| Corporate Authors: | , |
|---|---|
| Format: | Government Document eBook |
| Language: | English |
| Published: |
Washington :
U.S. G.P.O.,
1962.
|
| Series: | U.S. Congressional Hearings.
|
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
| Summary: | Reviews proposed contract between AEC, Bonneville Power Administration and Washington State Public Power System for construction and operation of the Hanford nuclear reactor. |
|---|---|
| Item Description: | Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC. Electronic resource. |
| Physical Description: | 1 online resource. |
| Format: | System requirements: PDF reader software. |