Proposed Arrangements for Electric Generating Facilities at Hanford New Production Reactor : hearings before the United States Joint Committee on Atomic Energy, Eighty-Seventh Congress, second session, on Sept. 27, 1962.

Reviews proposed contract between AEC, Bonneville Power Administration and Washington State Public Power System for construction and operation of the Hanford nuclear reactor.

Bibliographic Details
Corporate Authors: United States. Congress. Joint Committee on Atomic Energy, ProQuest (Firm)
Format: Government Document eBook
Language:English
Published: Washington : U.S. G.P.O., 1962.
Series:U.S. Congressional Hearings.
Subjects:
Online Access:Connect to the full text of this electronic book

Internet

Connect to the full text of this electronic book

Available Online

Holdings details from Available Online
Call Number: HRG-1962-AEJ-0012
 
Call Number Status Get It
HRG-1962-AEJ-0012 Available