Collision loads on bridge piers, phase 2 : report of guidelines for designing bridge piers and abutments for vehicle collisions /
"An instrumented, simulated bridge pier was constructed, and two full-scale collisions with an 80,000-lb van type tractor-trailer were performed on it. The trailer was ballasted with bags of sand on pallets. The simulated pier was 36 inches in diameter and was supported in the longitudinal dire...
| Corporate Authors: | , , |
|---|---|
| Other Authors: | |
| Format: | eBook |
| Language: | English |
| Published: |
College Station, Tex. :
Texas Transportation Institute, Texas A & M University System,
[2011]
|
| Series: | Research report (Austin, Tex.) ;
9-4973-2. |
| Subjects: | |
| Online Access: | Connect to the full text of this online report. |
Internet
Connect to the full text of this online report.Available Online
| Call Number: |
HE203 .T43 no. 9-4973-2 |
|
|---|---|---|
| Call Number | Status | Get It |
| HE203 .T43 no. 9-4973-2 | Available | |