A simulation study of a Subsea Mudlift Drilling system during tripping operations /

To face the new challenges that the petroleum industry has in deepwaters, a Subsea Mudlift Drilling Joint Industry Project, SMDJIP, was formed. The main task for this project is to develop the technology needed to drill in water depths beyond 7500 feet- the practical limit of current floating drilli...

Full description

Bibliographic Details
Main Author: Escobar Parada, Alvaro Hernando, 1975-
Format: Thesis eBook
Language:English
Published: [Place of publication not identified] : [publisher not identified] ; 1999.
Subjects:
Online Access:Link to OAKTrust copy

Internet

Link to OAKTrust copy

Cushing: Theses & Dissertations Microforms (Does not check out)

Holdings details from Cushing: Theses & Dissertations Microforms (Does not check out)
Call Number: 1999 Thesis E8
 
Call Number Status Get It
1999 Thesis E8 Available

Available Online

Holdings details from Available Online
Call Number: 1999 Thesis E8
 
Call Number Status Get It
1999 Thesis E8 Available