A method for developing visually intelligent construction scheduling data /
The integration of methods, materials, and manpower is the basis for planning the activities of a construction project. The scheduling of these resources used during the construction of buildings is a critical factor that can dramatically affect a project's budget, timeline, and overall succes...
| Main Author: | |
|---|---|
| Format: | Thesis eBook |
| Language: | English |
| Published: |
[Place of publication not identified] :
[publisher not identified] ;
2001.
|
| Subjects: | |
| Online Access: | Link to OAKTrust copy |
Internet
Link to OAKTrust copyCushing: Theses & Dissertations Microforms (Does not check out)
| Call Number: |
2001 Thesis P55 |
|
|---|---|---|
| Call Number | Status | Get It |
| 2001 Thesis P55 | Available | |
Available Online
| Call Number: |
2001 Thesis P55 |
|
|---|---|---|
| Call Number | Status | Get It |
| 2001 Thesis P55 | Available | |