Activity-based costing simulation as a tool for construction process optimization /
The goal of this research was to develop and illustrate a procedure to achieve time- cost optimization for a construction operation by finding the adequate crew configurations. The time-cost relationship in a construction operation was defined to develop the scope of time-cost optimization in this r...
| Main Author: | Son, Junghye |
|---|---|
| Format: | Thesis eBook |
| Language: | English |
| Published: |
[Place of publication not identified] :
[publisher not identified] ;
1999.
|
| Subjects: | |
| Online Access: | Link to OAKTrust copy |
Similar Items
A knowledge-based object-oriented simulation framework for construction process planning /
by: Hoque, Md. Saiful, 1964-
Published: (1988)
by: Hoque, Md. Saiful, 1964-
Published: (1988)
Optimization methodology for the calibration of transportation network micro-simulation models /
by: Kim, Kyu-Ok
Published: (2002)
by: Kim, Kyu-Ok
Published: (2002)
An optimization-simulation model for real time operation of a multireservoir water supply system /
by: Ibanez-Castillo, Laura Alicia, 1964-
Published: (1997)
by: Ibanez-Castillo, Laura Alicia, 1964-
Published: (1997)
Optimal owner contractor relationships based on capital project competencies /
by: Patil, Shekhar Suresh, 1968-
Published: (2000)
by: Patil, Shekhar Suresh, 1968-
Published: (2000)
Incinerator residue in bituminous base construction.
by: Haynes, Joseph Anthony
Published: (1975)
by: Haynes, Joseph Anthony
Published: (1975)
Construction work process management /
by: Soares, Jorge Barbosa, 1970-
Published: (1994)
by: Soares, Jorge Barbosa, 1970-
Published: (1994)
Development of genetic algorithm-based signal optimization program for oversaturated intersections /
by: Park, Byungkyu
Published: (1998)
by: Park, Byungkyu
Published: (1998)
A computer solution to assist in estimating and optimizing the duration and cost of operations for earthmoving systems.
by: Smith, James Charles
Published: (1970)
by: Smith, James Charles
Published: (1970)
A parametric building energy cost optimization tool based on a genetic algorithm /
by: Tan, Xiaowei, 1973-
Published: (2007)
by: Tan, Xiaowei, 1973-
Published: (2007)
LSRM - a tool for logic simulation of RISC-based microprocessor /
by: Jiang, Xiaohua, 1961-
Published: (1993)
by: Jiang, Xiaohua, 1961-
Published: (1993)
Web-based 4D visualization for construction scheduling /
by: Kang, Ho-Yeong
Published: (2001)
by: Kang, Ho-Yeong
Published: (2001)
Constructibility review process framework for transportation facilities /
by: Liman, Majed, 1970-
Published: (1995)
by: Liman, Majed, 1970-
Published: (1995)
Optimizing detector placement for isolated intersections based on minimizing average delay and number of stops /
by: Hoppers, Kevin Paul
Published: (2000)
by: Hoppers, Kevin Paul
Published: (2000)
Construction methods and comparative merits of low-cost bituminous roads.
by: Adams, Cyril Samuel, 1910-
Published: (1933)
by: Adams, Cyril Samuel, 1910-
Published: (1933)
Modeling of construction cost data for probabilistic range estimating limited by small data sets of historical costs /
by: Evrenosoglu, Faik Burak
Published: (1996)
by: Evrenosoglu, Faik Burak
Published: (1996)
Enhancing construction productivity through continuous process improvements /
by: Cottrell, David Sherman
Published: (1995)
by: Cottrell, David Sherman
Published: (1995)
The effect of construction variables on the dynamic modulus of asphalt treated base courses.
by: Moeller, William Ernest
Published: (1970)
by: Moeller, William Ernest
Published: (1970)
Digital simulation of a diamond interchange.
by: Woods, Donald Lee
Published: (1967)
by: Woods, Donald Lee
Published: (1967)
Tool developing of MRR strategy selection /
by: Liu, Juanyu
Published: (2001)
by: Liu, Juanyu
Published: (2001)
Control of construction of an earthern embankment based on observations of neutral pressure in a rapidly consolidating foundation medium.
by: Dodd, Willie C.
Published: (1952)
by: Dodd, Willie C.
Published: (1952)
Utilizing optimization in municipal stormwater management /
by: Dorman, Stephen Paul, 1971-
Published: (1995)
by: Dorman, Stephen Paul, 1971-
Published: (1995)
Computer optimization of earthmoving equipment arrays.
by: Pate, Jep Earl
Published: (1971)
by: Pate, Jep Earl
Published: (1971)
Identification of potential strategies, methods, and tools for improving cost estimating practices for highway projects /
by: Donnell, Kelly E., 1980-
Published: (2005)
by: Donnell, Kelly E., 1980-
Published: (2005)
Reductive dechlorination of chlorinated hydrocarbons using Fe(II) and modified green rusts in degradative solidification/stabilization /
by: Son, Sukil
Published: (2002)
by: Son, Sukil
Published: (2002)
A knowledge based constructability analysis prototype /
by: Winter, Laura Jo
Published: (1988)
by: Winter, Laura Jo
Published: (1988)
The cost effectiveness of geotechnical investigations in commercial building construction /
by: Temple, Merdith Wyndham Bolling, 1953-
Published: (1985)
by: Temple, Merdith Wyndham Bolling, 1953-
Published: (1985)
A simulation model for generation of aquifer characteristics and contaminant concentrations /
by: Deena, Jayaram, 1969-
Published: (1993)
by: Deena, Jayaram, 1969-
Published: (1993)
Investigation of traffic simulation models for a signalized street network.
by: Miller, Edmond Trowbridge
Published: (1967)
by: Miller, Edmond Trowbridge
Published: (1967)
Numerical simulations of mine penetration in soft sediments /
by: Yao, Zhigang, 1977-
Published: (2003)
by: Yao, Zhigang, 1977-
Published: (2003)
Optimal Resource Adjustment Times in product development project /
by: Lee, Zee Woon 1975-
Published: (2004)
by: Lee, Zee Woon 1975-
Published: (2004)
A simulation model for planning and management of solid waste collection systems.
by: McCoy, Patrick Thomas
Published: (1971)
by: McCoy, Patrick Thomas
Published: (1971)
A comparison of the cost of urban transportation modes.
by: Hatchell, William Jack
Published: (1968)
by: Hatchell, William Jack
Published: (1968)
Solidification/stabilization of simulated uranium and nickel contaminated sludges /
by: Ramabhadran, Sanjay, 1971-
Published: (1996)
by: Ramabhadran, Sanjay, 1971-
Published: (1996)
Adobe as a construction material in Texas.
by: Harrington, Edwin Lincoln
Published: (1943)
by: Harrington, Edwin Lincoln
Published: (1943)
Critical assessment of the features of two ramp metering optimization models /
by: Park, Eunmi, 1963-
Published: (1993)
by: Park, Eunmi, 1963-
Published: (1993)
Modified niched pareto multi-objective genetic algorithm for construction scheduling optimization /
by: Kim, Kyungki
Published: (2012)
by: Kim, Kyungki
Published: (2012)
A study of the flexural properties of a black base.
by: Layman, Andrew Hodnett
Published: (1968)
by: Layman, Andrew Hodnett
Published: (1968)
Quantifying improvements in the Engineering-Procurement-Construction (EPC) process from the implementation of information management strategies within materials management /
by: Toon, Jeffrey Lee
Published: (1997)
by: Toon, Jeffrey Lee
Published: (1997)
Modeling soil : tool interaction in a lunar soil simulant /
by: Willman, Brian Michael, 1966-
Published: (1994)
by: Willman, Brian Michael, 1966-
Published: (1994)
Simulation of vehicular delays on two-lane rural highway grades.
by: Byington, Stanley R.
Published: (1964)
by: Byington, Stanley R.
Published: (1964)