Activity-based costing simulation as a tool for construction process optimization /
The goal of this research was to develop and illustrate a procedure to achieve time- cost optimization for a construction operation by finding the adequate crew configurations. The time-cost relationship in a construction operation was defined to develop the scope of time-cost optimization in this r...
| Main Author: | |
|---|---|
| Format: | Thesis eBook |
| Language: | English |
| Published: |
[Place of publication not identified] :
[publisher not identified] ;
1999.
|
| Subjects: | |
| Online Access: | Link to OAKTrust copy |
Internet
Link to OAKTrust copyCushing: Theses & Dissertations Microforms (Does not check out)
| Call Number: |
1999 Thesis S667 |
|
|---|---|---|
| Call Number | Status | Get It |
| 1999 Thesis S667 | Available | |
Available Online
| Call Number: |
1999 Thesis S667 |
|
|---|---|---|
| Call Number | Status | Get It |
| 1999 Thesis S667 | Available | |