The time to reach pseudosteady-state in horizontal wells /

Engineers need to estimate the expected productivity of horizontal wells. We need to know how long it takes to reach pseudosteady-state to accept that estimation. When all boundaries influence the pressure distribution in the drainage area, then we can say we have reached pseudosteady- state. Res...

Full description

Bibliographic Details
Main Author: Al-Kahtani, Abdulghafour
Format: Thesis eBook
Language:English
Published: [Place of publication not identified] : [publisher not identified] ; 1998.
Subjects:
Online Access:Link to OAKTrust copy

Internet

Link to OAKTrust copy

Cushing: Theses & Dissertations Microforms (Does not check out)

Holdings details from Cushing: Theses & Dissertations Microforms (Does not check out)
Call Number: 1998 Thesis A45
 
Call Number Status Get It
1998 Thesis A45 Available

Available Online

Holdings details from Available Online
Call Number: 1998 Thesis A45
 
Call Number Status Get It
1998 Thesis A45 Available