The impact of crew mix on productivity and labor cost of a construction work activity /
In the conduct of construction, situations may arise where a shortage of craftsmen forces crew compositions with a larger than desirable proportion of unskilled workers to do the work that must be done. The net effect on total labor cost and duration of that work activity is critical. The issue is...
| Main Author: | |
|---|---|
| Format: | Thesis eBook |
| Language: | English |
| Published: |
[Place of publication not identified] :
[publisher not identified] ;
1988.
|
| Subjects: | |
| Online Access: | Link to OAKTrust copy |
Internet
Link to OAKTrust copyRemote Storage
| Call Number: |
1988 Thesis G878 |
|
|---|---|---|
| Notes: |
Cushing Archival Copy (Library Use Only) |
|
| Call Number | Status | Get It |
| 1988 Thesis G878 | Available | |
Available Online
| Call Number: |
1988 Thesis G878 |
|
|---|---|---|
| Call Number | Status | Get It |
| 1988 Thesis G878 | Available | |