Table of Contents:
“...Drum Storage -- Cranes and Rigging -- Lifting Precautions -- Wire Ropes, Chains, and Slings -- Tag Lines -- Start-Up -- Commissioning -- Operational Readiness Review -- Start-Up -- 9 Maintenance -- Introduction -- Regulations and Standards -- Maintenance Management System -- Types of Maintenance -- Repair Maintenance -- Condition-Based Maintenance -- Scheduled Maintenance -- Reliability-Centered Maintenance -- Procurement -- Spare Parts -- Documentation -- Factory Acceptance Tests -- Maintenance Task Organization -- Step 1-Plan the Work -- Step 2-Conduct a JHA -- Step 3-Prepare/Issue a Work Permit -- Step 4-Shutdown and Isolate Equipment -- Step 5-First Break -- Step 6-Perform the Work -- Step 7-Close Out the Work -- Step 8-Handover to Operations -- Equipment check -- Inspected, tested, and documented -- System completion -- Operational readiness/prestartup safety review -- Pressure Tests -- Testing Procedure -- Installing Blinds -- Test Medium -- Hydrostatic/liquid test -- Pneumatic/gas -- Tightness Test -- Strength Test -- Pressure Test Manual -- Records -- Online Cleaning and Repair -- Corrosion -- Cathodic Protection -- Corrosion Under Insulation -- CO2 Corrosion -- Sulfide Stress Cracking -- Controlling Corrosion -- Simultaneous Operations -- Managing SIMOPs -- SIMOPs Matrix -- Conducting SIMOPs -- Kickoff meeting -- Communication meetings -- Closeout -- 10 Energy Control -- Introduction -- Regulations and Standards -- 29 CFR 1910.119 -- Rule -- Guidance -- API 2015 -- API 2026 -- API 2217A -- ANSI Z117.1 -- NFPA 69 -- Example -- Risk Management -- Energy Control
Program -- Step 1-Job Hazards Analysis -- Step 2-Work Permit -- General Work Permits -- Hot Work Permits -- Confined Space Permits -- Issuing the Permit -- Multiple Work Permits -- Changes in Conditions -- Barrier Tape -- Step 3-Vent,
Drain, and Purge -- Inert Gas....
”
Call Number:
Loading...
Located:
Loading...
Connect to the full text of this electronic book
eBook