Search Results - computer program based data processing.

Search alternatives:

Refine Results
  1. 4181
    by Halder, Abhishek
    Published 2015
    Link to OAK Trust copy
    Thesis eBook
  2. 4182
    by Jeet, Param, Vats, Prashant
    Published 2017
    Connect to this electronic resource
    eBook
  3. 4183
  4. 4184
  5. 4185
  6. 4186
    by Miroshnikov, Andreĭ
    Published 2018
    Connect to this electronic resource
    eBook
  7. 4187
  8. 4188
    Published 2018
    Table of Contents: ...Note continued: 16.2.1.Background on penalized high-dimensional regression and the choice of penalty function / Lan Wang -- 16.2.2.Nonconvex penalized high-dimensional linear quantile regression / Lan Wang -- 16.2.2.1.Overview / Lan Wang -- 16.2.2.2.Oracle property of the nonconvex penalized quantile regression estimator / Lan Wang -- 16.3.High-dimensional sparse semiparametric quantile regression / Lan Wang -- 16.3.1.Overview / Lan Wang -- 16.3.2.Nonconvex penalized partially linear additive quantile regression / Lan Wang -- 16.3.3.Oracle properties / Lan Wang -- 16.4.Computational aspects of nonconvex penalized quantile regression / Lan Wang -- 16.4.1.Linear programming based algorithms (moderately large p) / Lan Wang -- 16.4.2.New iterative coordinate descent algorithm (larger p) / Lan Wang -- 16.5.Other related problems / Lan Wang -- 16.5.1.Simultaneous estimation and variable selection at multiple quintiles / Lan Wang...
    Connect to the full text of this electronic book
    eBook
  9. 4189
  10. 4190
  11. 4191
  12. 4192
  13. 4193
  14. 4194
    by Sutton, Ian
    Published 2017
    Table of Contents: ...Drum Storage -- Cranes and Rigging -- Lifting Precautions -- Wire Ropes, Chains, and Slings -- Tag Lines -- Start-Up -- Commissioning -- Operational Readiness Review -- Start-Up -- 9 Maintenance -- Introduction -- Regulations and Standards -- Maintenance Management System -- Types of Maintenance -- Repair Maintenance -- Condition-Based Maintenance -- Scheduled Maintenance -- Reliability-Centered Maintenance -- Procurement -- Spare Parts -- Documentation -- Factory Acceptance Tests -- Maintenance Task Organization -- Step 1-Plan the Work -- Step 2-Conduct a JHA -- Step 3-Prepare/Issue a Work Permit -- Step 4-Shutdown and Isolate Equipment -- Step 5-First Break -- Step 6-Perform the Work -- Step 7-Close Out the Work -- Step 8-Handover to Operations -- Equipment check -- Inspected, tested, and documented -- System completion -- Operational readiness/prestartup safety review -- Pressure Tests -- Testing Procedure -- Installing Blinds -- Test Medium -- Hydrostatic/liquid test -- Pneumatic/gas -- Tightness Test -- Strength Test -- Pressure Test Manual -- Records -- Online Cleaning and Repair -- Corrosion -- Cathodic Protection -- Corrosion Under Insulation -- CO2 Corrosion -- Sulfide Stress Cracking -- Controlling Corrosion -- Simultaneous Operations -- Managing SIMOPs -- SIMOPs Matrix -- Conducting SIMOPs -- Kickoff meeting -- Communication meetings -- Closeout -- 10 Energy Control -- Introduction -- Regulations and Standards -- 29 CFR 1910.119 -- Rule -- Guidance -- API 2015 -- API 2026 -- API 2217A -- ANSI Z117.1 -- NFPA 69 -- Example -- Risk Management -- Energy Control Program -- Step 1-Job Hazards Analysis -- Step 2-Work Permit -- General Work Permits -- Hot Work Permits -- Confined Space Permits -- Issuing the Permit -- Multiple Work Permits -- Changes in Conditions -- Barrier Tape -- Step 3-Vent, Drain, and Purge -- Inert Gas....
    Connect to the full text of this electronic book
    eBook
  15. 4195
  16. 4196
    by Kumar, Ashish
    Published 2019
    Connect to this electronic resource
    eBook
  17. 4197
    Published 2014
    Table of Contents: ...Cui -- Tidal range analysis of the central Jiangsu coast based on the measured tide level data / Y. Kang & X. ...
    Connect to the full text of this electronic book
    Conference Proceeding eBook
  18. 4198
  19. 4199
  20. 4200