Gulf Intercoastal Waterway, Texas : specifications for dredging Port Bolivar to Galveston Causeway in Galveston County, Texas.
Information for bidders.
| Corporate Author: | United States. Army. Corps of Engineers. Galveston District |
|---|---|
| Format: | Book |
| Language: | English |
| Published: |
Galveston, Texas :
Department of the Army, Galveston District, Corps of Engineers,
1996.
|
| Subjects: |
Similar Items
Bayport Ship Channel, Texas : specifications for dredging Bayport Ship Channel in Chambers and Harris Counties, Texas.
Published: (1996)
Published: (1996)
Specifications for dredging Matagorda Bay to San Antonio Bay in Calhoun County, Texas.
Published: (1973)
Published: (1973)
Environmental assessment, Gulf Intracoastal Waterway (main Channel), High Island to Galveston Bay, Texas, alternative placement area for Rollover Pass, Texas.
Published: (1996)
Published: (1996)
Field study of an unconfined spoil disposal area of the Gulf Intracoastal Waterway in Galveston Bay, Texas /
by: Bassi, D. E.
Published: (1974)
by: Bassi, D. E.
Published: (1974)
Shoaling characteristics of the Gulf Intracoastal Waterway in Texas /
by: Atturio, John Michael
Published: (1976)
by: Atturio, John Michael
Published: (1976)
Enhancing the sustainability of gulf intracoastal waterway dredge material placement areas /
by: Kruse, C. James, et al.
Published: (2019)
by: Kruse, C. James, et al.
Published: (2019)
Maintenance dredging effects on vegetation adjacent to the Gulf Intracoastal Waterway - Cedar Lakes Section /
by: Vaughan, Randy
Published: (1977)
by: Vaughan, Randy
Published: (1977)
Optimum disposal methods for use on the Gulf Intracoastal Waterway /
Published: (1989)
Published: (1989)
[Report on Gulf Intracoastal Waterway relative to construction of alternate channel in south Galveston Bay.].
Published: (1949)
Published: (1949)
Maintenance dredging, Gulf intracoastal waterway, Texas section, main channel and tributary channels : draft environmental statement /
Published: (1974)
Published: (1974)
Report of the Secretary of War; being part of the message and documents communicated to the two Houses of Congress at the beginning of the second session of the Fifty-fourth Congress.
Published: (1896)
Published: (1896)
Letter from the Secretary of War, submitting a report and drawings of the survey of Allegany River.
Published: (1838)
Published: (1838)
Report of the Secretary of War; being part of the message and documents communicated to the two Houses of Congress at the beginning of the second session of the Fifty-fourth Congress.
Published: (1896)
Published: (1896)
Shoaling characteristics of the Gulf Intracoastal Waterway in Texas /
by: Atturio, John Michael
Published: (1976)
by: Atturio, John Michael
Published: (1976)
Maintenance dredging channel to Port Bolivar, Texas.
Published: (1974)
Published: (1974)
Maintenance dredging, Gulf intracoastal waterway, Texas section, main channel and tributary channels : draft environmental statement /
Published: (1974)
Published: (1974)
Maintenance dredging, Gulf intracoastal waterway, Texas section, main channel and tributary channels : final environmental statement /
Published: (1975)
Published: (1975)
Dredge and fill activities in Galveston Bay /
by: Ward, George H.
Published: (1993)
by: Ward, George H.
Published: (1993)
Maintenance dredging : Galveston Harbor and Channel, Texas (Galveston Harbor Channels) : final environmental statement.
Published: (1975)
Published: (1975)
Magnetometer survey and diving Gulf Intracoastal Waterway and Houston Ship Channel intersection, Galveston County, Texas /
by: Schmidt, James S.
Published: (1995)
by: Schmidt, James S.
Published: (1995)
Report of the Secretary of War; being part of the message and documents communicated to the two Houses of Congress at the beginning of the second session of the Fifty-fourth Congress.
Published: (1896)
Published: (1896)
Second annual reports of the Panama Canal Company and the Canal Zone Government for the fiscal year ended June 30 1953.
Published: (1954)
Published: (1954)
Report of the Secretary of War; being part of the message and documents communicated to the two Houses of Congress at the beginning of the first session of the Forty-ninth Congress.
Report of the Secretary of War, being part of the message and documents communicated to the two Houses of Congress at the beginning of the second session of the Forty-second Congress.
Published: (1871)
Published: (1871)
Disturbance in a stressed environment : bank vegetation of the Gulf Intercoastal Waterway at Cedar Lake, Texas /
by: Vaughan, Randy Joe, 1949-
Published: (1977)
by: Vaughan, Randy Joe, 1949-
Published: (1977)
Memorial of H. I. Chapman, Civil Engineer, praying the adoption of his accompanying plans and specifications for the permanent improvement of the Willamette River in Oregon.
Published: (1874)
Published: (1874)
Final environmental statement : maintenance dredging : Clear Creek and Clear Lake, Texas.
Published: (1975)
Published: (1975)
Economic analysis of the Texas Gulf Intracoastal Waterway /
by: Richards, Robert R., 1939-
Published: (1973)
by: Richards, Robert R., 1939-
Published: (1973)
Draft environmental statement, Galveston Harbor and Channel, Texas (Galveston Channel) : maintenance dredging.
Published: (1975)
Published: (1975)
Master plan for the Texas Gulf intracoastal waterway in Texas.
Published: (2016)
Published: (2016)
Archeological survey of the Bolivar Ferry Terminal expansion and underwater evaluation of one unidentified magnetic anomaly, Bolivar Peninsula, Galveston County, Texas /
Published: (2006)
Published: (2006)
Analysis of the role of the Gulf Intracoastal Waterway in Texas.
Published: (1974)
Published: (1974)
Texas Gulf intracoastal waterway master plan : technical report /
by: Kruse, C. James, et al.
Published: (2016)
by: Kruse, C. James, et al.
Published: (2016)
Highlights of the Texas Gulf intracoastal waterway master plan.
by: Kruse, C. James
Published: (2016)
by: Kruse, C. James
Published: (2016)
Record of public hearing on : application of Mitchell Development Corporation of the Southwest for a Department of the Army permit to dredge a connecting canal, a two-loop canal system with finger canals and erect piers, bulkheads, and boat launches in West Bay and Eckerts Bayou at Stewart Road between 11 and 12 Mile Roads, Galveston, Texas /
Published: (1975)
Published: (1975)
0-6807: Texas Gulf intracoastal waterway master plan /
by: Kruse, C. James, et al.
Published: (2016)
by: Kruse, C. James, et al.
Published: (2016)
Final feasibility report and environmental impact statement, Galveston Bay area naviagation study /
Published: (1987)
Published: (1987)
Technical slide presentation of the beneficial uses plan for placement of dredged material /
Published: (1994)
Published: (1994)
Estimated number of dredge tows required to detect changes in oyster abundance in Galveston Bay /
by: Matlock, Gary C.
Published: (1985)
by: Matlock, Gary C.
Published: (1985)
Galveston harbor and channel, Texas : Galveston Channel 40-foot project.
Published: (1973)
Published: (1973)