IEA Wind recommended practice for the implementation of renewable energy forecasting solutions /
Published as an Open Access book available on Science Direct, IEA Wind Recommended Practices for the Implementation of Renewable Energy Forecasting Solutions translates decades of academic knowledge and standard requirements into applicable procedures and decision support tools for the energy indust...
| Corporate Author: | |
|---|---|
| Other Authors: | |
| Format: | eBook |
| Language: | English |
| Published: |
London, UK :
Academic Press,
[2023].
|
| Series: | Wind energy engineering series.
|
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
Table of Contents:
- Part One : Forecast solution selection process
- Chapter One : Forecast solution selection process
- Chapter Two : Initial considerations
- Chapter Three - Decision support tool
- Chapter Four : Data communication
- Chapter Five : Concluding remarks
- Part Two : Designing and executing forecasting benchmarks and trials
- Chapter Six : Designing and executing benchmarks and trials
- Chapter Seven : Initial considerations
- Chapter Eight : Conducting a benchmark or trial
- Chapter Nine : Considerations for probabilistic benchmarks and trials
- Chapter Ten : Best practice recommendations for benchmarks/trials
- Part Three : Forecast solution evaluation
- Chapter Eleven : Forecast solution evaluation
- Chapter Twelve : Overview of evaluation uncertainty
- Chapter Thirteen : Measurement data processing and control
- Chapter Fourteen : Assessment of forecast performance
- Chapter Fifteen : Best practice recommendations for forecast evaluation
- Part Four: Meteorological and power data requirements for real-time forecasting applications
- Chapter Sixteen : Meteorological and power data requirements for real-time forecasting applications
- Chapter Seventeen : Use and application of real-time meteorological measurements
- Chapter Eighteen : Meteorological instrumentation for real-time operation
- Chapter Nineteen : Power measurements for real-time operation
- Chapter Twenty : Measurement setup and calibration
- Chapter Twenty-One : Assessment of instrumentation performance
- Chapter Twenty-Two : Best practice recommendations
- Chapter Twenty-Three : End note
- Appendix A : Clarification questions for forecast solutions
- Appendix B : Typical RFI questions prior to or in an RFP
- Appendix C : Application examples for use of probabilistic uncertainty forecasts
- Appendix D : Metadata checklist
- Appendix E : Sample forecast file structures
- Appendix F : Standard statistical metrics
- Appendix G : Validation and verification code examples
- Appendix H : Examples of system operator met measurement requirements