| Abstract: | This document is Product 0-7169-P3, Long-Term Statewide EV Infrastructure Strategic Plan, which the research team developed as part of Task 6 of Texas Department of Transportation (TxDOT) Project 0-7169, Post-NEVI Electric Vehicle Infrastructure Research (Freight, Fleet, and Multifamily Housing). The purpose of the long-term strategic plan is to guide infrastructure investment across the state, with a goal of a stable and consistent electric vehicle (EV) charging network. The plan is intended to help guide future charging infrastructure funding opportunities and provide guidance to effectively and equitably distribute available funding. |