Table of Contents:
  • 1. Development of trenchless technology
  • 2. Pipejacking and microtunnelling methods
  • 3. Equipment: shields and tunnel boring machines
  • 4. Pipejacking: line, drive pit, top side
  • 5. Equipment: microtunnelling
  • 6. Design concepts
  • 7. Subsurface and site investigation
  • 8. Design: permanent works
  • 9. Design: choice of method
  • 10. Temporary work design: the line
  • 11. Drive and reception pits
  • 12. Design: contract documents
  • 13. Site control and supervision
  • 14. Economic considerations.