| Tag |
First Indicator |
Second Indicator |
Subfields |
| LEADER |
00000nam a2200000 i 4500 |
| 001 |
in00005504613 |
| 006 |
m o d |
| 007 |
cr |n||||||||n |
| 008 |
210416s2016||||nyu|||||o|||||||||||eng|| |
| 005 |
20241008175936.1 |
| 010 |
|
|
|z 2017471514
|
| 020 |
|
|
|a 9780071821841 (e-ISBN)
|
| 020 |
|
|
|a 0071821848 (e-ISBN)
|
| 020 |
|
|
|a 9780071823340 (print-ISBN)
|
| 020 |
|
|
|a 0071823344 (print-ISBN)
|
| 035 |
|
|
|a (OCoLC)960035832
|
| 035 |
|
|
|a (IN-ChSCO)scn00100252
|
| 040 |
|
|
|a IN-ChSCO
|b eng
|e rda
|
| 041 |
0 |
|
|a eng
|
| 050 |
|
4 |
|a TA190
|
| 072 |
|
7 |
|a TEC
|x 009020
|2 bisacsh
|
| 072 |
|
7 |
|a TEC
|x 010000
|2 bisacsh
|
| 082 |
0 |
4 |
|a 620.0068
|2 23
|
| 100 |
1 |
|
|a Najafi, Mohammad,
|e author.
|
| 245 |
1 |
0 |
|a Pipeline Infrastructure Renewal and Asset Management /
|c Mohammad Najafi.
|
| 250 |
|
|
|a First edition.
|
| 264 |
|
1 |
|a New York, N.Y. :
|b McGraw-Hill Education,
|c [2016]
|
| 264 |
|
4 |
|c 2016
|
| 300 |
|
|
|a 1 online resource (560 pages) :
|b 175 illustrations.
|
| 336 |
|
|
|a text
|b txt
|2 rdacontent
|
| 337 |
|
|
|a computer
|b c
|2 rdamedia
|
| 338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
| 490 |
1 |
|
|a McGraw-Hill's AccessEngineering
|
| 504 |
|
|
|a Includes bibliographical references and index.
|
| 505 |
0 |
|
|a A. About the Author -- B. About NASSCO -- C. Dedication -- D. Foreword -- E. Preface -- F. Acknowledgments -- PREFACE PRELIMINARIES -- Reviewers -- 1. Introduction and Overview -- CHAPTER PRELIMINARIES -- Introduction -- Extending Service Life -- Trenchless Renewal Methods -- Sewer Manhole Renewal -- Selection of a Renewal Method -- Current Design Concepts for Pipeline Renewals -- Emerging Design Concepts for Pipeline Renewal Systems -- Long-Term Test Methods -- Common Terms and Practices in Pipeline Renewal -- Chapter Summary -- Review Questions -- 2. Pipeline Asset Management -- CHAPTER PRELIMINARIES -- Introduction -- Benefits of Asset Management -- Major Questions in an Asset Management Program -- Asset Management Framework -- Government Accounting Standards Board Statement 34 -- Condition Assessment Tools and Methods -- Risk Management in Piping Systems -- Asset Management of Oil and Gas-Related Pipelines -- Chapter Summary -- Review Questions -- 3. Design Considerations for Trenchless Renewal Methods -- CHAPTER PRELIMINARIES -- Introduction -- TRM Selection Process -- Renewal Method Depends on the Existing Pipe Conditions -- Renewal Method Depends on Site and Project Conditions -- Selection of a Renewal Method (a 10-Step Process) -- General Design Considerations -- Structural Design of CIPP -- Chapter Summary -- Review Questions -- 4. Pipeline Prioritization, Inventory and Condition Assessment -- CHAPTER PRELIMINARIES -- Introduction and Background -- Pipeline Condition Assessment -- Model Input Parameters -- Data Collection, Analysis, and Management -- Condition Assessment -- Condition Assessment Technologies forGravity and Pressure Systems -- Condition Assessment Technologies Specific for Water Distribution System -- Data Collection and Manipulation -- System Integration and Operation -- Chapter Summary -- Review Questions -- 5. Pipe and Pipe Installation Considerations -- CHAPTER PRELIMINARIES -- Introduction -- Pipeline Construction Using Open-Cut Method -- The Pipe-Soil System -- Common Modes of Pipeline Failures -- Pipe Selection Considerations -- Cement-Based Pipes -- Vitrified Clay Pipe -- Plastics Pipes -- Metallic Pipes -- Corrosion Protection: General -- Chapter Summary -- Review Questions -- 6. Cured-in-Place Pipe -- CHAPTER PRELIMINARIES -- Introduction -- Site Compatibility and Applications -- Impacts of Existing Pipeline Defects on CIPP -- Main Characteristics -- Method Description -- Inspecting Installation of CIPP -- Pipe Plugging or Bypass Pumping -- Quality Assurance and Testing -- Major Advantages -- Major Limitations -- Scheduling and Costs -- Chapter Summary -- Review Questions -- 7. Sliplining -- CHAPTER PRELIMINARIES -- Introduction -- Site Compatibility and Applications -- Main Characteristics -- Sliplining Methods -- Installation -- Design Considerations -- Sliplining Gaslines -- Advantages -- Limitations -- Case Study -- Chapter Summary -- Review Questions.
|
| 505 |
0 |
|
|a 8. In-line Replacement and Pipe Bursting -- CHAPTER PRELIMINARIES -- Introduction -- Construction Considerations -- Pipe Bursting Methods -- Pipe Removal Methods -- Pipe Materials -- Pipe Bursting versus Other Alternatives -- Pipe-Bursting Project Classification -- Advantages and Limitations -- Preliminary Surveying -- Preparatory Work -- Design Considerations -- Risk Assessment Plan -- Plans and Specifications -- Construction Considerations -- Groves on the Outside Surface of the Pipe -- As-built Drawings -- Contingency Plan -- Safety Considerations -- Completion Work -- Replacing Laterals -- Pipe Bursting with Segmental Pipes -- Quality Assurance and Documentation -- Cost Estimating -- Potential Problems -- Pipe Design -- Case Study: Asbestos Pipe Replacement -- Chapter Summary -- Review Questions -- 9. Modified Sliplining -- CHAPTER PRELIMINARIES -- Introduction -- Primary Characteristics -- Preliminary Inspection -- Preparatory Work -- Safety Issues -- Relining with Steel Pipe -- Project Delivery -- Advantages -- Limitations -- Chapter Summary -- Review Question -- 10. Spray-in-Place Pipe -- CHAPTER PRELIMINARIES -- Introduction -- Material Type and Purpose -- Installation Process -- Inspection and Testing -- Chapter Summary -- Review Questions -- 11. Close-Fit Pipe -- CHAPTER PRELIMINARIES -- Introduction -- CFP Applications -- Construction Considerations -- Quality Assurance and Documentation -- Review Questions -- 12. Sewer Manhole Renewal -- CHAPTER PRELIMINARIES -- Introduction -- Manhole Problems -- Classification of Manhole Problems -- Manhole Renewal Methods -- Chapter Summary -- Review Questions -- 13. Sanitary Sewer Lateral Renewal -- CHAPTER PRELIMINARIES -- Introduction -- Service Lateral Renewal Methods -- Chapter Summary -- Review Questions -- 14. Localized Repairs -- CHAPTER PRELIMINARIES -- Introduction -- Primary Characteristics -- Robotic Repairs -- Grouting -- Internal Seal -- Point CIPP -- Chapter Summary -- Review Questions -- A. APPENDIX A: Acronyms -- APPENDIX A: Acronyms -- B. APPENDIX B: Glossary of Terms -- APPENDIX B: Glossary of Terms -- C. APPENDIX C: Abbreviations for Organizations Related to Trenchless Technology -- APPENDIX C: Abbreviations for Organizations Related to Trenchless Technology -- D. APPENDIX D: Related Documents -- APPENDIX D: Related Documents -- Publication Sources -- Technical Journal -- Magazines and Newsletters -- E. APPENDIX E: Conversion Table -- APPENDIX E: Conversion Table -- F. APPENDIX F: Members of Center for Underground Infrastructure Research and Education (CUIRE) -- APPENDIX F: Members of Center for Underground Infrastructure Research and Education (CUIRE) -- G. References -- References -- Applicable Standards.
|
| 520 |
3 |
|
|a This practical resource covers the latest methods to manage, value, and estimate the life and cost of pipeline infrastructure assets.
|
| 530 |
|
|
|a Also available in print edition.
|
| 533 |
|
|
|a Electronic reproduction.
|b New York, N.Y. :
|c McGraw Hill,
|d 2016.
|n Mode of access: World Wide Web.
|n System requirements: Web browser.
|n Access may be restricted to users at subscribing institutions.
|
| 538 |
|
|
|a Mode of access: Internet via World Wide Web.
|
| 546 |
|
|
|a In English.
|
| 588 |
|
|
|a Description based on e-Publication PDF.
|
| 650 |
|
0 |
|a Pipelines.
|
| 650 |
|
0 |
|a Pipelines
|x Maintenance and repair.
|
| 650 |
|
0 |
|a Pipelines
|x Design and construction.
|
| 655 |
|
7 |
|a Electronic books.
|2 local
|
| 710 |
2 |
|
|a McGraw-Hill Companies.
|
| 776 |
0 |
|
|i Print version:
|t Pipeline Infrastructure Renewal and Asset Management.
|b First edition.
|d New York, N.Y. : McGraw-Hill Education, 2016
|w (OCoLC)953006615
|
| 830 |
|
0 |
|a McGraw-Hill's AccessEngineering.
|
| 856 |
4 |
0 |
|u http://proxy.library.tamu.edu/login?url=https://www.accessengineeringlibrary.com/content/book/9780071823340
|z Connect to the full text of this electronic book
|t 0
|
| 949 |
|
|
|a TA 190
|w LC
|c 1
|i 100252-1001
|d 08/25/2016
|l MAIN
|m MGH
|q 1
|r Y
|s Y
|t WEB
|u 08/25/2016
|x ENG
|
| 999 |
f |
f |
|s 83013bb8-96fe-4fd7-92d2-9288f0d87237
|i 7d03e0ad-233e-4055-bee4-ff5cefb9fd73
|t 0
|
| 952 |
f |
f |
|a Texas A&M University
|b College Station
|c Electronic Resources
|d Available Online
|t 0
|e TA190
|h Library of Congress classification
|
| 998 |
f |
f |
|a TA190
|t 0
|l Available Online
|