Procedure of inert gas system operation test : s. no. 248 2/3 268.500LT turbine tanker /
| Corporate Author: | |
|---|---|
| Format: | Book |
| Language: | English |
| Published: |
[Place of publication not identified] :
The Company,
1976.
|
| Subjects: |
| Item Description: | Cover title. "Aug. 19, 1976." "Work no. 211-2482/3; classification, A.B.S.; drawing no. NBC DWG NO. 547-2-21, KURE DWG NO. K4000620." |
|---|---|
| Physical Description: | 19 leaves (1 folded) : illustrations, 1 plan ; 28 cm |