Hite, J. E., & Murphy, T. E. (1998). Model study of St. Stephen Powerhouse Fish Passage Facilities, Cooper River Rediversion Project, South Carolina. U.S. Army Engineer Waterways Experiment Station.
Chicago Style (17th ed.) CitationHite, John E., and Thomas E. Murphy. Model Study of St. Stephen Powerhouse Fish Passage Facilities, Cooper River Rediversion Project, South Carolina. Vicksburg, Mississippi: U.S. Army Engineer Waterways Experiment Station, 1998.
MLA (9th ed.) CitationHite, John E., and Thomas E. Murphy. Model Study of St. Stephen Powerhouse Fish Passage Facilities, Cooper River Rediversion Project, South Carolina. U.S. Army Engineer Waterways Experiment Station, 1998.
Warning: These citations may not always be 100% accurate.