Value of implementation : TxDOT Project 5-6656-01, Verification of ASR resistance property of the commonly used concrete mix designs by the precast industries in Texas.
| Main Author: | |
|---|---|
| Corporate Author: | |
| Format: | eBook |
| Language: | English |
| Published: |
College Station, TX :
Texas A&M Transportation Institute, the Texas A&M University System,
[2019]
|
| Subjects: | |
| Online Access: | Connect to the full text of this document Connect to the project summary |
| Item Description: | "Date: August 2019; To: Kevin Pete, Project Manager, RTI, Texas Department of Transportation; From: Anol Mukhopadhyay, Research Supervisor, Senior Research Scientist, Texas A&M Transportation Institute"--Page [1]. "Report Number: 5-6656-01-VOI"--TTI online catalog. "The Value of Implementation (VoI) analysis is determined at the end of this project to identify appropriate qualitative and economic benefits. Table 1 summarizes the benefit areas determined in this project, followed by a brief discussion for each selected benefit"--Page [1]. |
|---|---|
| Physical Description: | 1 online resource (3 pages) : table |
| Access: | Open access content |