Production availability and reliability : use in the oil and gas industry /

Bibliographic Details
Main Author: Leroy, Alain (Author)
Format: eBook
Language:English
Published: London, UK : Hoboken, NJ : ISTE Ltd ; John Wiley & Sons, Inc., 2018.
Series:Systems and industrial engineering series.
Subjects:
Online Access:Connect to the full text of this electronic book
Table of Contents:
  • Machine generated contents note: 1.1.Introduction
  • 1.2.Definition of terms
  • 1.2.1.Risk
  • 1.2.2.Time definitions
  • 1.2.3.Failures and repairs
  • 1.2.4.IEC 61508 terms
  • 1.3.Definition of parameters
  • 1.3.1.Reliability
  • 1.3.2.Maintainability
  • 1.3.3.Availability and production availability
  • 1.3.4.Dependability
  • 1.3.5.Definitions used by maintenance engineers
  • 1.3.6.Definitions used in the refinery industry
  • 1.4.The exponential law/the constant failure rate
  • 1.4.1.Reliability
  • 1.4.2.Validity
  • 1.4.3.Oil and gas industry
  • 1.5.The bathtub curve
  • 1.5.1.Meaning
  • 1.5.2.Useful life and mission life
  • 1.5.3.Validity
  • 1.5.4.Oil and gas industry
  • 2.1.Introduction
  • 2.2.Basis of probability and statistics
  • 2.2.1.Boolean algebra
  • 2.2.2.Probability relations
  • 2.2.3.Probability distributions
  • 2.2.4.Characteristics of probability distributions
  • 2.2.5.Families and conjugates
  • 2.3.Formulae and theorems
  • 2.3.1.Combinatorial analysis
  • 2.3.2.Central limit theorem
  • 2.3.3.Chebyshev's inequality
  • 2.3.4.Laws of large numbers
  • 2.3.5.Supporting functions and distributions
  • 2.3.6.Bayes' theorem
  • 2.4.Useful discrete probability distributions
  • 2.4.1.Binomial distribution
  • 2.4.2.Poisson distribution
  • 2.5.Useful continuous probability distributions
  • 2.5.1.Exponential distribution
  • 2.5.2.Uniform distribution
  • 2.5.3.Triangular distribution
  • 2.5.4.Normal distribution
  • 2.5.5.Log-normal distribution
  • 2.5.6.Weibull distribution
  • 2.5.7.Gamma distribution
  • 2.5.8.Beta distribution
  • 2.5.9.Chi-squared distribution
  • 2.5.10.Fisher-Snedecor distribution
  • 2.6.Statistical estimates
  • 2.6.1.Estimates
  • 2.6.2.Calculation of point estimate
  • 2.6.3.Calculation of confidence interval
  • 2.6.4.Heterogeneous samples
  • 2.6.5.Implementation
  • 2.7.Fitting of failure distribution
  • 2.7.1.Principle
  • 2.7.2.Median rank method
  • 2.7.3.Implementation
  • 2.8.Hypothesis testing
  • 2.8.1.Principle
  • 2.8.2.Existing tests
  • 2.8.3.Implementation
  • 2.9.Bayesian reliability
  • 2.9.1.Definition
  • 2.9.2.Use of Bayes' theorem
  • 2.9.3.Bayesian inference
  • 2.9.4.Selection of the prior probability distribution
  • 2.9.5.Determination of the posterior probability distribution
  • 2.9.6.Bayesian credibility interval
  • 2.10.Extreme value probability distributions
  • 2.10.1.Meaning
  • 2.10.2.The three extreme value probability distributions
  • 2.10.3.Use in the industry
  • 3.1.Introduction
  • 3.2.Single item
  • 3.2.1.Availability
  • 3.2.2.Number of failures
  • 3.3.System reliability
  • 3.3.1.Series systems
  • 3.3.2.Parallel systems
  • 3.4.Specific architectures
  • 3.4.1.Method of analysis
  • 3.4.2.Redundant item system
  • 3.5.On-guard items
  • 3.5.1.Unrevealed failures
  • 3.5.2.Full formula
  • 3.5.3.Optimum proof test duration
  • 4.1.Introduction
  • 4.2.Failure Mode and Effects Analysis
  • 4.2.1.Conventional Failure Mode and Effects Analysis/Failure Mode, Effects and Criticality Analysis
  • 4.2.2.Functional/hardware FMEA
  • 4.2.3.Case study
  • 4.3.Fault trees
  • 4.3.1.Conventional fault trees
  • 4.3.2.Fault tree extensions
  • 4.3.3.Facilities provided by software packages
  • 4.3.4.Case study
  • 4.4.Reliability block diagrams
  • 4.4.1.Conventional RBDs
  • 4.4.2.RBD extension
  • 4.4.3.Facilities provided by software packages
  • 4.4.4.Case study
  • 4.5.Monte Carlo method
  • 4.5.1.Principle
  • 4.5.2.Use for production availability and reliability
  • 4.5.3.How many runs are enough9
  • 5.1.Introduction
  • 5.2.Petri nets
  • 5.2.1.Definition
  • 5.2.2.Mathematical properties
  • 5.2.3.Petri net construction
  • 5.2.4.GRAFCET
  • 5.3.IEC 62551 extensions
  • 5.3.1.Extensions to structure
  • 5.3.2.Modified execution rules
  • 5.4.Additional extensions
  • 5.4.1.Extensions to structure
  • 5.4.2.Modified execution rules
  • 5.5.Facilities provided by software packages
  • 5.5.1.Additional extensions to structure
  • 5.5.2.Modified execution rules
  • 5.5.3.Petri net processing
  • 5.5.4.Results
  • 5.6.Petri net construction
  • 5.6.1.Petri net modeling
  • 5.6.2.Minimizing the risk of error input
  • 5.6.3.Petri net checking
  • 5.6.4.Petri net validation
  • 5.7.Case study
  • 5.7.1.System description
  • 5.7.2.Petri net model
  • 6.1.Introduction
  • 6.2.The OREDA project
  • 6.2.1.History
  • 6.2.2.Project management and organization
  • 6.2.3.Description of OREDA 2015 handbooks
  • 6.2.4.Use of the data tables
  • 6.2.5.Use of the additional tables
  • 6.2.6.Reliability database and data analysis software
  • 6.2.7.Data collection software
  • 6.3.The PDS handbook
  • 6.3.1.History
  • 6.3.2.Description of the handbook
  • 6.3.3.Use of the handbook
  • 6.4.Reliability Analysis Center/Reliability Information Analysis Center publications
  • 6.4.1.History
  • 6.4.2.Non-electronic Part Reliability Data handbook
  • 6.4.3.FMD
  • 6.4.4.NONOP
  • 6.4.5.Use of the publications
  • 6.5.Other publications
  • 6.5.1.EXIDA handbooks
  • 6.5.2.Electrical items
  • 6.5.3.Pipelines
  • 6.5.4.Flexibles
  • 6.5.5.Miscellaneous
  • 6.6.Missing information
  • 7.1.Introduction
  • 7.2.Reliability test data
  • 7.2.1.Principle
  • 7.2.2.Test organization
  • 7.2.3.Assessment of failure rate
  • 7.3.Field data
  • 7.3.1.Principle
  • 7.3.2.Data collection organization
  • 7.3.3.Assessment of failure rate
  • 7.3.4.Assessment of probability to fail upon demand
  • 7.3.5.Assessment of MRT
  • 7.3.6.Case study
  • 7.4.Accelerated tests
  • 7.4.1.Principle
  • 7.4.2.Example
  • 7.4.3.Highly accelerated tests
  • 7.5.Reliability growth
  • 7.5.1.Principle
  • 7.5.2.Main models
  • 8.1.Introduction
  • 8.2.Basis
  • 8.2.1.Definitions
  • 8.2.2.Protocol for expert elicitation
  • 8.2.3.Role of the facilitator
  • 8.3.Characteristics of the experts
  • 8.3.1.Definition
  • 8.3.2.Selection
  • 8.3.3.Biases
  • 8.3.4.Expert weighting
  • 8.3.5.Expert dependence
  • 8.3.6.Aggregation of judgments
  • 8.4.Use of questionnaires
  • 8.4.1.Conditions of use
  • 8.4.2.The Delphi method
  • 8.4.3.Case study
  • 8.5.Use of interactive group
  • 8.5.1.Number of experts
  • 8.5.2.Procedure
  • 8.6.Use of individual interviews
  • 8.6.1.Conditions of use
  • 8.6.2.Case study
  • 8.7.Bayesian aggregation of judgment
  • 8.7.1.Form of information provided by experts
  • 8.7.2.Assessment of failure rate (or MTBF)
  • 8.7.3.Assessment of probability of failure upon demand
  • 8.8.Validity of expert judgment
  • 9.1.Introduction
  • 9.2.Common cause failures
  • 9.2.1.Introduction
  • 9.2.2.Defmition
  • 9.2.3.Defenses against CCF
  • 9.2.4.CCF modeling with the beta-factor method
  • 9.2.5.CCF modeling with the shock method
  • 9.2.6.Extension of the beta-factor model: the PDS method
  • 9.2.7.Field data
  • 9.2.8.Impact of CCF on system reliability
  • 9.2.9.Impact of testing policy on CCF
  • 9.2.10.Impact of CCF on system production availability
  • 9.2.11.Benchmark on CCF assessment
  • 9.3.Mechanical reliability
  • 9.3.1.Characteristics
  • 9.3.2.Stress-strength interference
  • 9.3.3.Empirical reliability relationships
  • 9.3.4.Comparison with system (constant failure rate) approach
  • 9.4.Reliability of electronic items
  • 9.4.1.Characteristics
  • 9.4.2.MIL-HDBK-217
  • 9.4.3.UTE-C-80811
  • 9.4.4.Other reliability data books
  • 9.4.5.EPRD
  • 9.4.6.Effect of dormancy period
  • 9.4.7.Common cause failures
  • 9.4.8.Comparison of previsions
  • 9.4.9.Use in the oil and gas industry
  • 9.5.Human reliability
  • 9.5.1.Human factors
  • 9.5.2.Human reliability in the nuclear industry
  • 9.5.3.Evaluation of HRA techniques
  • 9.5.4.Human reliability in the oil and gas industry
  • 10.1.Introduction
  • 10.2.Definition of reliability target
  • 10.2.1.Absoluteleliability target
  • 10.2.2.Risk target
  • 10.3.Methodology of system reliability study
  • 10.3.1.Overall description
  • 10.3.2.Step 1: system analysis
  • 10.3.3.Step 2: qualitative analysis
  • 10.3.4.Step 3: quantitative data selection
  • 10.3.5.Step 4: system reliability modeling
  • 10.3.6.Step 5: synthesis
  • 10.4.SIL studies
  • 10.4.1.Introduction
  • 10.4.2.SIL assignment
  • 10.4.3.SIL demonstration
  • 10.5.Description of the case study
  • 10.5.1.Origin of the risk
  • 10.5.2.Description of the standard SIF
  • 10.5.3.Risk assessment
  • 10.6.System analysis
  • 10.6.1.Description of HIPS functioning
  • 10.7.Qualitative analysis
  • 10.7.1.FMEA
  • 10.7.2.CCF analysis
  • 10.8.Quantitative data selection
  • 10.8.1.Selection of reliability data
  • 10.8.2.Collection of proof test data
  • 10.8.3.CCF quantification
  • 10.9.System reliability modeling
  • 10.9.1.Building of system reliability model
  • 10.9.2.System reliability calculation
  • 10.10.Synthesis
  • 10.10.1.Conclusions
  • 10.10.2.Recommendations
  • 10.11.Validity of system reliability assessments
  • 10.11.1.Reports
  • 10.11.2.Conclusions
  • 11.1.Introduction
  • 11.2.Definition of production availability target
  • 11.2.1.Absolute production availability target
  • 11.2.2.Economic target
  • 11.3.Methodology
  • 11.3.1.Events considered in production availability assessments
  • 11.3.2.Overall description
  • 11.3.3.Step 1: system analysis
  • 11.3.4.Step 2: quantitative data selection
  • 11.3.5.Step 3: production availability assessment
  • 11.3.6.Step 4: synthesis
  • 11.4.System analysis
  • 11.4.1.Determination of system running modes
  • 11.4.2.Item failure analysis
  • 11.5.Quantitative data selection
  • 11.5.1.Selection of reliability data
  • 11.5.2.Collection of operational data
  • 11.6.Production availability assessment
  • 11.6.1.Building of production availability model
  • 11.6.2.Production availability calculations
  • 11.7.Synthesis
  • 11.7.1.Main results
  • 11.7.2.Additional economic parameters
  • 11.7.3.Flared gas
  • 11.7.4.Other results
  • 11.7.5.Recommendations
  • 11.8.Uncertainty on the reliability parameters
  • 11.9.Validity of production availability assessments
  • 12.1.Introduction
  • 12.2.Principles of dependability management
  • 12.2.1.Dependability property management
  • 12.2.2.Phasing of the management
  • 12.2.3.Lifecycle costing and dependability
  • 12.3.Technical specifications
  • 12.3.1.Contents
  • Note continued: 12.3.2.Reliability specification
  • 12.3.3.Production availability specification
  • 12.4.Reliability and production availability program
  • 12.4.1.Contents
  • 12.4.2.Reliability program
  • 12.4.3.Production availability program
  • 12.5.Validation of system reliability
  • 12.5.1.Reliability data collection
  • 12.5.2.Random failures
  • 12.5.3.Common cause failures
  • 12.6.Validation of production availability
  • 12.6.1.Useful life
  • 12.6.2.Reliability data
  • 12.6.3.Production data
  • 12.6.4.Use of production availability model
  • Appendix 1 Notations and Abbreviations
  • Appendix 2 Markov Chain
  • Appendix 3 Comparison of Modeling Methods
  • Appendix 4 Solutions of Exercises.