Production availability and reliability : use in the oil and gas industry /
| Main Author: | |
|---|---|
| Format: | eBook |
| Language: | English |
| Published: |
London, UK : Hoboken, NJ :
ISTE Ltd ; John Wiley & Sons, Inc.,
2018.
|
| Series: | Systems and industrial engineering series.
|
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
Table of Contents:
- Machine generated contents note: 1.1.Introduction
- 1.2.Definition of terms
- 1.2.1.Risk
- 1.2.2.Time definitions
- 1.2.3.Failures and repairs
- 1.2.4.IEC 61508 terms
- 1.3.Definition of parameters
- 1.3.1.Reliability
- 1.3.2.Maintainability
- 1.3.3.Availability and production availability
- 1.3.4.Dependability
- 1.3.5.Definitions used by maintenance engineers
- 1.3.6.Definitions used in the refinery industry
- 1.4.The exponential law/the constant failure rate
- 1.4.1.Reliability
- 1.4.2.Validity
- 1.4.3.Oil and gas industry
- 1.5.The bathtub curve
- 1.5.1.Meaning
- 1.5.2.Useful life and mission life
- 1.5.3.Validity
- 1.5.4.Oil and gas industry
- 2.1.Introduction
- 2.2.Basis of probability and statistics
- 2.2.1.Boolean algebra
- 2.2.2.Probability relations
- 2.2.3.Probability distributions
- 2.2.4.Characteristics of probability distributions
- 2.2.5.Families and conjugates
- 2.3.Formulae and theorems
- 2.3.1.Combinatorial analysis
- 2.3.2.Central limit theorem
- 2.3.3.Chebyshev's inequality
- 2.3.4.Laws of large numbers
- 2.3.5.Supporting functions and distributions
- 2.3.6.Bayes' theorem
- 2.4.Useful discrete probability distributions
- 2.4.1.Binomial distribution
- 2.4.2.Poisson distribution
- 2.5.Useful continuous probability distributions
- 2.5.1.Exponential distribution
- 2.5.2.Uniform distribution
- 2.5.3.Triangular distribution
- 2.5.4.Normal distribution
- 2.5.5.Log-normal distribution
- 2.5.6.Weibull distribution
- 2.5.7.Gamma distribution
- 2.5.8.Beta distribution
- 2.5.9.Chi-squared distribution
- 2.5.10.Fisher-Snedecor distribution
- 2.6.Statistical estimates
- 2.6.1.Estimates
- 2.6.2.Calculation of point estimate
- 2.6.3.Calculation of confidence interval
- 2.6.4.Heterogeneous samples
- 2.6.5.Implementation
- 2.7.Fitting of failure distribution
- 2.7.1.Principle
- 2.7.2.Median rank method
- 2.7.3.Implementation
- 2.8.Hypothesis testing
- 2.8.1.Principle
- 2.8.2.Existing tests
- 2.8.3.Implementation
- 2.9.Bayesian reliability
- 2.9.1.Definition
- 2.9.2.Use of Bayes' theorem
- 2.9.3.Bayesian inference
- 2.9.4.Selection of the prior probability distribution
- 2.9.5.Determination of the posterior probability distribution
- 2.9.6.Bayesian credibility interval
- 2.10.Extreme value probability distributions
- 2.10.1.Meaning
- 2.10.2.The three extreme value probability distributions
- 2.10.3.Use in the industry
- 3.1.Introduction
- 3.2.Single item
- 3.2.1.Availability
- 3.2.2.Number of failures
- 3.3.System reliability
- 3.3.1.Series systems
- 3.3.2.Parallel systems
- 3.4.Specific architectures
- 3.4.1.Method of analysis
- 3.4.2.Redundant item system
- 3.5.On-guard items
- 3.5.1.Unrevealed failures
- 3.5.2.Full formula
- 3.5.3.Optimum proof test duration
- 4.1.Introduction
- 4.2.Failure Mode and Effects Analysis
- 4.2.1.Conventional Failure Mode and Effects Analysis/Failure Mode, Effects and Criticality Analysis
- 4.2.2.Functional/hardware FMEA
- 4.2.3.Case study
- 4.3.Fault trees
- 4.3.1.Conventional fault trees
- 4.3.2.Fault tree extensions
- 4.3.3.Facilities provided by software packages
- 4.3.4.Case study
- 4.4.Reliability block diagrams
- 4.4.1.Conventional RBDs
- 4.4.2.RBD extension
- 4.4.3.Facilities provided by software packages
- 4.4.4.Case study
- 4.5.Monte Carlo method
- 4.5.1.Principle
- 4.5.2.Use for production availability and reliability
- 4.5.3.How many runs are enough9
- 5.1.Introduction
- 5.2.Petri nets
- 5.2.1.Definition
- 5.2.2.Mathematical properties
- 5.2.3.Petri net construction
- 5.2.4.GRAFCET
- 5.3.IEC 62551 extensions
- 5.3.1.Extensions to structure
- 5.3.2.Modified execution rules
- 5.4.Additional extensions
- 5.4.1.Extensions to structure
- 5.4.2.Modified execution rules
- 5.5.Facilities provided by software packages
- 5.5.1.Additional extensions to structure
- 5.5.2.Modified execution rules
- 5.5.3.Petri net processing
- 5.5.4.Results
- 5.6.Petri net construction
- 5.6.1.Petri net modeling
- 5.6.2.Minimizing the risk of error input
- 5.6.3.Petri net checking
- 5.6.4.Petri net validation
- 5.7.Case study
- 5.7.1.System description
- 5.7.2.Petri net model
- 6.1.Introduction
- 6.2.The OREDA project
- 6.2.1.History
- 6.2.2.Project management and organization
- 6.2.3.Description of OREDA 2015 handbooks
- 6.2.4.Use of the data tables
- 6.2.5.Use of the additional tables
- 6.2.6.Reliability database and data analysis software
- 6.2.7.Data collection software
- 6.3.The PDS handbook
- 6.3.1.History
- 6.3.2.Description of the handbook
- 6.3.3.Use of the handbook
- 6.4.Reliability Analysis Center/Reliability Information Analysis Center publications
- 6.4.1.History
- 6.4.2.Non-electronic Part Reliability Data handbook
- 6.4.3.FMD
- 6.4.4.NONOP
- 6.4.5.Use of the publications
- 6.5.Other publications
- 6.5.1.EXIDA handbooks
- 6.5.2.Electrical items
- 6.5.3.Pipelines
- 6.5.4.Flexibles
- 6.5.5.Miscellaneous
- 6.6.Missing information
- 7.1.Introduction
- 7.2.Reliability test data
- 7.2.1.Principle
- 7.2.2.Test organization
- 7.2.3.Assessment of failure rate
- 7.3.Field data
- 7.3.1.Principle
- 7.3.2.Data collection organization
- 7.3.3.Assessment of failure rate
- 7.3.4.Assessment of probability to fail upon demand
- 7.3.5.Assessment of MRT
- 7.3.6.Case study
- 7.4.Accelerated tests
- 7.4.1.Principle
- 7.4.2.Example
- 7.4.3.Highly accelerated tests
- 7.5.Reliability growth
- 7.5.1.Principle
- 7.5.2.Main models
- 8.1.Introduction
- 8.2.Basis
- 8.2.1.Definitions
- 8.2.2.Protocol for expert elicitation
- 8.2.3.Role of the facilitator
- 8.3.Characteristics of the experts
- 8.3.1.Definition
- 8.3.2.Selection
- 8.3.3.Biases
- 8.3.4.Expert weighting
- 8.3.5.Expert dependence
- 8.3.6.Aggregation of judgments
- 8.4.Use of questionnaires
- 8.4.1.Conditions of use
- 8.4.2.The Delphi method
- 8.4.3.Case study
- 8.5.Use of interactive group
- 8.5.1.Number of experts
- 8.5.2.Procedure
- 8.6.Use of individual interviews
- 8.6.1.Conditions of use
- 8.6.2.Case study
- 8.7.Bayesian aggregation of judgment
- 8.7.1.Form of information provided by experts
- 8.7.2.Assessment of failure rate (or MTBF)
- 8.7.3.Assessment of probability of failure upon demand
- 8.8.Validity of expert judgment
- 9.1.Introduction
- 9.2.Common cause failures
- 9.2.1.Introduction
- 9.2.2.Defmition
- 9.2.3.Defenses against CCF
- 9.2.4.CCF modeling with the beta-factor method
- 9.2.5.CCF modeling with the shock method
- 9.2.6.Extension of the beta-factor model: the PDS method
- 9.2.7.Field data
- 9.2.8.Impact of CCF on system reliability
- 9.2.9.Impact of testing policy on CCF
- 9.2.10.Impact of CCF on system production availability
- 9.2.11.Benchmark on CCF assessment
- 9.3.Mechanical reliability
- 9.3.1.Characteristics
- 9.3.2.Stress-strength interference
- 9.3.3.Empirical reliability relationships
- 9.3.4.Comparison with system (constant failure rate) approach
- 9.4.Reliability of electronic items
- 9.4.1.Characteristics
- 9.4.2.MIL-HDBK-217
- 9.4.3.UTE-C-80811
- 9.4.4.Other reliability data books
- 9.4.5.EPRD
- 9.4.6.Effect of dormancy period
- 9.4.7.Common cause failures
- 9.4.8.Comparison of previsions
- 9.4.9.Use in the oil and gas industry
- 9.5.Human reliability
- 9.5.1.Human factors
- 9.5.2.Human reliability in the nuclear industry
- 9.5.3.Evaluation of HRA techniques
- 9.5.4.Human reliability in the oil and gas industry
- 10.1.Introduction
- 10.2.Definition of reliability target
- 10.2.1.Absoluteleliability target
- 10.2.2.Risk target
- 10.3.Methodology of system reliability study
- 10.3.1.Overall description
- 10.3.2.Step 1: system analysis
- 10.3.3.Step 2: qualitative analysis
- 10.3.4.Step 3: quantitative data selection
- 10.3.5.Step 4: system reliability modeling
- 10.3.6.Step 5: synthesis
- 10.4.SIL studies
- 10.4.1.Introduction
- 10.4.2.SIL assignment
- 10.4.3.SIL demonstration
- 10.5.Description of the case study
- 10.5.1.Origin of the risk
- 10.5.2.Description of the standard SIF
- 10.5.3.Risk assessment
- 10.6.System analysis
- 10.6.1.Description of HIPS functioning
- 10.7.Qualitative analysis
- 10.7.1.FMEA
- 10.7.2.CCF analysis
- 10.8.Quantitative data selection
- 10.8.1.Selection of reliability data
- 10.8.2.Collection of proof test data
- 10.8.3.CCF quantification
- 10.9.System reliability modeling
- 10.9.1.Building of system reliability model
- 10.9.2.System reliability calculation
- 10.10.Synthesis
- 10.10.1.Conclusions
- 10.10.2.Recommendations
- 10.11.Validity of system reliability assessments
- 10.11.1.Reports
- 10.11.2.Conclusions
- 11.1.Introduction
- 11.2.Definition of production availability target
- 11.2.1.Absolute production availability target
- 11.2.2.Economic target
- 11.3.Methodology
- 11.3.1.Events considered in production availability assessments
- 11.3.2.Overall description
- 11.3.3.Step 1: system analysis
- 11.3.4.Step 2: quantitative data selection
- 11.3.5.Step 3: production availability assessment
- 11.3.6.Step 4: synthesis
- 11.4.System analysis
- 11.4.1.Determination of system running modes
- 11.4.2.Item failure analysis
- 11.5.Quantitative data selection
- 11.5.1.Selection of reliability data
- 11.5.2.Collection of operational data
- 11.6.Production availability assessment
- 11.6.1.Building of production availability model
- 11.6.2.Production availability calculations
- 11.7.Synthesis
- 11.7.1.Main results
- 11.7.2.Additional economic parameters
- 11.7.3.Flared gas
- 11.7.4.Other results
- 11.7.5.Recommendations
- 11.8.Uncertainty on the reliability parameters
- 11.9.Validity of production availability assessments
- 12.1.Introduction
- 12.2.Principles of dependability management
- 12.2.1.Dependability property management
- 12.2.2.Phasing of the management
- 12.2.3.Lifecycle costing and dependability
- 12.3.Technical specifications
- 12.3.1.Contents
- Note continued: 12.3.2.Reliability specification
- 12.3.3.Production availability specification
- 12.4.Reliability and production availability program
- 12.4.1.Contents
- 12.4.2.Reliability program
- 12.4.3.Production availability program
- 12.5.Validation of system reliability
- 12.5.1.Reliability data collection
- 12.5.2.Random failures
- 12.5.3.Common cause failures
- 12.6.Validation of production availability
- 12.6.1.Useful life
- 12.6.2.Reliability data
- 12.6.3.Production data
- 12.6.4.Use of production availability model
- Appendix 1 Notations and Abbreviations
- Appendix 2 Markov Chain
- Appendix 3 Comparison of Modeling Methods
- Appendix 4 Solutions of Exercises.