New code of estimating practice /

The essential, authoritative guide to providing accurate, systematic, and reliable estimating for construction projects--newly revised.

Bibliographic Details
Corporate Author: Chartered Institute of Building (Great Britain)
Other Authors: Flanagan, Roger (Contributor), Jewell, Carol (Contributor)
Format: eBook
Language:English
Published: Hoboken, NJ : Wiley, [2018]
Subjects:
Online Access:Connect to the full text of this electronic book
Table of Contents:
  • Machine generated contents note: Section One Principles
  • the theory and background
  • 1.Introduction
  • 1.1.An imprecise science
  • 1.2.Data, information, and knowledge In estimating
  • 1.3.Experience, Instinct, gut feel, intuition and bias
  • 1.4.Optimism bias
  • 2.The Fundamentals
  • 2.1.Tender and bid
  • 2.2.Pricing
  • 2.3.Profitability
  • 2.4.Types of tender
  • 2.5.Tender award
  • 2.6.The difference between procurement and tendering
  • 2.7.Methods of procurement
  • 3.Changes driving estimating practice
  • 3.1.Digitisation
  • 3.2.E-Tendering
  • 3.3.Legislation and taxation
  • 3.4.Bureaucracy
  • 3.5.Competition and winning work
  • 3.6.Specialisation
  • 3.7.New technologies and off-site production
  • 3.8.New methods of procurement
  • 3.9.Best value
  • 4.The bid process
  • 4.1.Work breakdown structure
  • 4.2.Underlying principles
  • 5.Health and safety
  • 5.1.Introduction
  • 5.2.Estimating the cost of health and safety
  • 6.The pre-qualification process
  • 6.1.Introduction
  • Note continued: 6.2.Bidding for public sector projects
  • 7.Procurement, selection, contractual arrangements and legal issues
  • 7.1.Methods of procurement
  • 7.2.Two-stage tendering
  • 7.3.Framework agreements
  • 7.4.Concession contracts
  • 7.5.Engineer Procure Construct (EPC)
  • 7.6.Prime contracting
  • 7.7.Early contractor involvement (ECI)
  • 7.8.Integrated Project Delivery (IPD)
  • 7.9.Selection processes
  • 7.10.Integrated design and construction
  • 7.11.E-procurement
  • 7.12.E-auctions
  • 7.13.Abnormally low tenders
  • 8.Preliminaries
  • 8.1.Site establishment
  • 8.2.Insurances, bonds and so on
  • 8.3.Site records
  • 8.4.Fees and charges
  • 8.5.Compliance
  • 8.6.Environmental management
  • 8.7.Wastewater treatment system
  • 8.8.Waste management
  • 8.9.Waste disposal, sorting and storage
  • 8.10.Setting out
  • 8.11.Control and protection
  • 8.12.Completion and post-completion requirements
  • 8.13.Contingencies
  • 8.14.Management and staff
  • 9.Temporary Works
  • Note continued: 9.1.Introduction
  • 9.2.Temporary works management
  • 9.3.Temporary works co-ordinator (TWC)
  • 9.4.Temporary works supervisor
  • 9.5.Temporary works register
  • 9.6.Temporary works design brief
  • 9.7.Scaffolding
  • 9.8.Falsework
  • 9.9.Formwork
  • 9.10.Earthworks
  • 9.11.Temporary services
  • 9.12.Facade retention
  • 9.13.Structures
  • design and loading
  • 9.14.Plant foundations
  • 9.15.Protection on-site
  • 9.16.Traffic management
  • 9.17.Temporary access for vehicles and pedestrians
  • 9.18.Barriers for pedestrians and vehicles
  • 9.19.Haul roads
  • 9.20.Works associated with any ordnance uncovered
  • 9.21.Signage
  • 9.22.Protection of adjacent properties
  • 10.Cost-estimating techniques
  • 10.1.Approximate quantities
  • 10.2.Cost planning
  • 11.Private finance initiative/public-private partnerships/build, operate and transfer, and whole-life costing
  • 12.Risk management
  • 12.1.Background
  • 12.2.Risk analysis
  • 12.3.Cost estimating accuracy
  • Note continued: 13.Logistics
  • 13.1.Materials logistics plan
  • 13.2.Materials management
  • 13.3.Personnel management and health and safety
  • 13.4.Plant, tools and equipment
  • maintenance and management
  • 13.5.Transportation
  • 13.6.Traffic management
  • 14.Resource and production planning
  • 14.1.Planning techniques
  • 14.2.Resource planning
  • 14.3.Time
  • its perception and impact on the estimating process
  • 15.Computer-aided cost estimating
  • 16.BIM and the estimating process
  • 16.1.Overview
  • 16.2.The challenges of using BIM in the estimating process
  • Section Two Processes
  • the practice
  • 1.Consider and assess
  • 1.1.Receive preliminary enquiry
  • 1.2.Consider order backlog/new orders
  • 1.3.Decision to tender (bid or no bid)
  • 1.4.Project information, schedule and questionnaire
  • 1.5.Consider client and consultant team and project delivery availability
  • 1.6.Assessment criteria
  • lowest price/quality and so on
  • 1.7.The likely competition
  • Note continued: 2.Information and time planning
  • 2.1.Works specialty/works contractor enquiries
  • 2.2.The bid team
  • 2.3.Produce bid timetable/strategy
  • 2.4.Examine documents
  • contract, design, bonds, warranties and insurance
  • 2.5.Site visit
  • utilities, ground conditions, adjacent properties and so on
  • 2.6.Method statement/logistics plan
  • 3.Contract terms and conditions
  • 3.1.Special employer requirements and modifications to standard clauses
  • 4.Resource planning and pricing
  • 4.1.Pricing the works
  • 4.2.Establish unit rates
  • labour and plant
  • 4.3.Establish unit rates
  • labour, materials and plant
  • 4.4.Labour cost issues
  • a summary
  • 4.5.Build-up unit rates
  • 4.6.Gang sizes for activities
  • 4.7.Allocation of costs
  • 4.8.All-in rates for plant and equipment
  • 4.9.Select materials and specialty contractors' quotations
  • 4.10.Specialty contractor quotations
  • 4.11.Provisional sums
  • defined and undefined
  • Note continued: 4.12.Incorporating provisional sums in an estimate
  • 4.13.Daywork
  • 4.14.Pricing the preliminaries
  • 4.15.Add allowances
  • 5.Prepare estimator's report
  • 6.Examine and consider
  • 6.1.Examine preliminaries
  • 6.2.Requests for further information
  • 6.3.Examine method and tender programme
  • 6.4.Examine resource costs
  • 6.5.Consider the competition for the project in the market
  • 6.6.Consider cash flow and capital requirements for the project
  • 7.Bld assembly and adjudication
  • 7.1.Finalise the pricing
  • 7.2.Bid adjudication/final review
  • 7.3.Qualification of any special items of tender
  • 8.Pre-production planning and processes
  • 8.1.Develop a detailed method statement
  • 8.2.Develop production planning schedule
  • 8.3.Allocate resources
  • 8.4.Obtain licences and so on from local authority and utilities organisation
  • 8.5.Ordering of long lead-time materials, plant and equipment
  • Note continued: 8.6.Request for further information from consultants and specialty contractors
  • 8.7.Pre-production schedule prior to work commencement
  • 8.8.Check conditions of contract award
  • 9.Site production
  • 9.1.Pricing change and variation orders
  • 9.2.Appointment of specialist contractors
  • 9.3.Estimating and pricing contractual claims
  • 9.4.Production of final account
  • 9.5.Cost
  • value reconciliation.