New code of estimating practice /
The essential, authoritative guide to providing accurate, systematic, and reliable estimating for construction projects--newly revised.
| Corporate Author: | |
|---|---|
| Other Authors: | , |
| Format: | eBook |
| Language: | English |
| Published: |
Hoboken, NJ :
Wiley,
[2018]
|
| Subjects: | |
| Online Access: | Connect to the full text of this electronic book |
Table of Contents:
- Machine generated contents note: Section One Principles
- the theory and background
- 1.Introduction
- 1.1.An imprecise science
- 1.2.Data, information, and knowledge In estimating
- 1.3.Experience, Instinct, gut feel, intuition and bias
- 1.4.Optimism bias
- 2.The Fundamentals
- 2.1.Tender and bid
- 2.2.Pricing
- 2.3.Profitability
- 2.4.Types of tender
- 2.5.Tender award
- 2.6.The difference between procurement and tendering
- 2.7.Methods of procurement
- 3.Changes driving estimating practice
- 3.1.Digitisation
- 3.2.E-Tendering
- 3.3.Legislation and taxation
- 3.4.Bureaucracy
- 3.5.Competition and winning work
- 3.6.Specialisation
- 3.7.New technologies and off-site production
- 3.8.New methods of procurement
- 3.9.Best value
- 4.The bid process
- 4.1.Work breakdown structure
- 4.2.Underlying principles
- 5.Health and safety
- 5.1.Introduction
- 5.2.Estimating the cost of health and safety
- 6.The pre-qualification process
- 6.1.Introduction
- Note continued: 6.2.Bidding for public sector projects
- 7.Procurement, selection, contractual arrangements and legal issues
- 7.1.Methods of procurement
- 7.2.Two-stage tendering
- 7.3.Framework agreements
- 7.4.Concession contracts
- 7.5.Engineer Procure Construct (EPC)
- 7.6.Prime contracting
- 7.7.Early contractor involvement (ECI)
- 7.8.Integrated Project Delivery (IPD)
- 7.9.Selection processes
- 7.10.Integrated design and construction
- 7.11.E-procurement
- 7.12.E-auctions
- 7.13.Abnormally low tenders
- 8.Preliminaries
- 8.1.Site establishment
- 8.2.Insurances, bonds and so on
- 8.3.Site records
- 8.4.Fees and charges
- 8.5.Compliance
- 8.6.Environmental management
- 8.7.Wastewater treatment system
- 8.8.Waste management
- 8.9.Waste disposal, sorting and storage
- 8.10.Setting out
- 8.11.Control and protection
- 8.12.Completion and post-completion requirements
- 8.13.Contingencies
- 8.14.Management and staff
- 9.Temporary Works
- Note continued: 9.1.Introduction
- 9.2.Temporary works management
- 9.3.Temporary works co-ordinator (TWC)
- 9.4.Temporary works supervisor
- 9.5.Temporary works register
- 9.6.Temporary works design brief
- 9.7.Scaffolding
- 9.8.Falsework
- 9.9.Formwork
- 9.10.Earthworks
- 9.11.Temporary services
- 9.12.Facade retention
- 9.13.Structures
- design and loading
- 9.14.Plant foundations
- 9.15.Protection on-site
- 9.16.Traffic management
- 9.17.Temporary access for vehicles and pedestrians
- 9.18.Barriers for pedestrians and vehicles
- 9.19.Haul roads
- 9.20.Works associated with any ordnance uncovered
- 9.21.Signage
- 9.22.Protection of adjacent properties
- 10.Cost-estimating techniques
- 10.1.Approximate quantities
- 10.2.Cost planning
- 11.Private finance initiative/public-private partnerships/build, operate and transfer, and whole-life costing
- 12.Risk management
- 12.1.Background
- 12.2.Risk analysis
- 12.3.Cost estimating accuracy
- Note continued: 13.Logistics
- 13.1.Materials logistics plan
- 13.2.Materials management
- 13.3.Personnel management and health and safety
- 13.4.Plant, tools and equipment
- maintenance and management
- 13.5.Transportation
- 13.6.Traffic management
- 14.Resource and production planning
- 14.1.Planning techniques
- 14.2.Resource planning
- 14.3.Time
- its perception and impact on the estimating process
- 15.Computer-aided cost estimating
- 16.BIM and the estimating process
- 16.1.Overview
- 16.2.The challenges of using BIM in the estimating process
- Section Two Processes
- the practice
- 1.Consider and assess
- 1.1.Receive preliminary enquiry
- 1.2.Consider order backlog/new orders
- 1.3.Decision to tender (bid or no bid)
- 1.4.Project information, schedule and questionnaire
- 1.5.Consider client and consultant team and project delivery availability
- 1.6.Assessment criteria
- lowest price/quality and so on
- 1.7.The likely competition
- Note continued: 2.Information and time planning
- 2.1.Works specialty/works contractor enquiries
- 2.2.The bid team
- 2.3.Produce bid timetable/strategy
- 2.4.Examine documents
- contract, design, bonds, warranties and insurance
- 2.5.Site visit
- utilities, ground conditions, adjacent properties and so on
- 2.6.Method statement/logistics plan
- 3.Contract terms and conditions
- 3.1.Special employer requirements and modifications to standard clauses
- 4.Resource planning and pricing
- 4.1.Pricing the works
- 4.2.Establish unit rates
- labour and plant
- 4.3.Establish unit rates
- labour, materials and plant
- 4.4.Labour cost issues
- a summary
- 4.5.Build-up unit rates
- 4.6.Gang sizes for activities
- 4.7.Allocation of costs
- 4.8.All-in rates for plant and equipment
- 4.9.Select materials and specialty contractors' quotations
- 4.10.Specialty contractor quotations
- 4.11.Provisional sums
- defined and undefined
- Note continued: 4.12.Incorporating provisional sums in an estimate
- 4.13.Daywork
- 4.14.Pricing the preliminaries
- 4.15.Add allowances
- 5.Prepare estimator's report
- 6.Examine and consider
- 6.1.Examine preliminaries
- 6.2.Requests for further information
- 6.3.Examine method and tender programme
- 6.4.Examine resource costs
- 6.5.Consider the competition for the project in the market
- 6.6.Consider cash flow and capital requirements for the project
- 7.Bld assembly and adjudication
- 7.1.Finalise the pricing
- 7.2.Bid adjudication/final review
- 7.3.Qualification of any special items of tender
- 8.Pre-production planning and processes
- 8.1.Develop a detailed method statement
- 8.2.Develop production planning schedule
- 8.3.Allocate resources
- 8.4.Obtain licences and so on from local authority and utilities organisation
- 8.5.Ordering of long lead-time materials, plant and equipment
- Note continued: 8.6.Request for further information from consultants and specialty contractors
- 8.7.Pre-production schedule prior to work commencement
- 8.8.Check conditions of contract award
- 9.Site production
- 9.1.Pricing change and variation orders
- 9.2.Appointment of specialist contractors
- 9.3.Estimating and pricing contractual claims
- 9.4.Production of final account
- 9.5.Cost
- value reconciliation.