Ecological requirements for pallid sturgeon reproduction and recruitment in the Missouri River--a synthesis of science, 2005 to 2012 /

Bibliographic Details
Main Author: DeLonay, Aaron J. (Author)
Corporate Authors: Integrated Science Program (U.S.), United States. Army. Corps of Engineers, Yankton (S.D.)
Format: Government Document eBook
Language:English
Published: Reston, Virginia : U.S. Department of the Interior, U.S. Geological Survey, 2016.
Series:Scientific investigations report ; 2015-5145.
Subjects:
Online Access:https://purl.fdlp.gov/GPO/gpo191259
Description
Item Description:"Prepared in cooperation with the Missouri River Recovery-Integrated Science Program, U.S. Army Corps of Engineers, Yankton, South Dakota."
GPO Cataloging Record Distribution Program (CRDP).
Physical Description:1 online resource (xiv, 224 pages) : color illustrations, color maps.
Bibliography:Includes bibliographical references.