Pavement repairs in preparation for a preventive maintenance contract /

Bibliographic Details
Main Authors: Estakhri, Cindy K. (Author), Gurganus, Charles (Author), Goehl, Darlene (Author)
Corporate Authors: Texas. Department of Transportation. Research and Technology Implementation Office (sponsoring body.), United States. Federal Highway Administration (sponsoring body.)
Format: eBook
Language:English
Published: College Station, Texas : Texas A&M Transportation Institute , December 2022.
Series:Research report (Austin, Tex.) ; 0-7109-R1.
Subjects:
Online Access:Connect to the full text of this electronic book
Connect to the project summary
Description
Abstract:The synthesis study focused on pavement preparatory work performed before preventive maintenance (PM) surfacing contracts with the goal of answering, “What work needs to be performed to the roadway before a new surface is placed?” Preparatory work performed by in-house maintenance forces or maintenance contracts may include crack sealing, fog seal, repairs, milling, and level-up and should be performed well in advance of the PM contract. Both flexible and rigid pavements may require work in advance of a PM contract. Seal coats or thin overlays are typical PM surfacing projects. The synthesis investigated best practices, factors that affect materials selected, factors that affect repair decisions, timing of preparatory work, and the effects of the repair procedures and materials on the life of the new surface based on the preparatory work performed.
Physical Description:1 online resource (ix, 57 pages) : color illustrations, color map
Bibliography:Includes bibliographical references (pages 37-38).