(2020). Report to Congress on the annual long-range plan for the construction of naval vessels. Office of the Chief of Naval Operations, Deputy Chief of Naval Operations (Warfighting Requirements and Capabilities - OPNAV N9).
Chicago Style (17th ed.) CitationReport to Congress on the Annual Long-range Plan for the Construction of Naval Vessels. Washington, DC: Office of the Chief of Naval Operations, Deputy Chief of Naval Operations (Warfighting Requirements and Capabilities - OPNAV N9), 2020.
MLA (9th ed.) CitationReport to Congress on the Annual Long-range Plan for the Construction of Naval Vessels. Office of the Chief of Naval Operations, Deputy Chief of Naval Operations (Warfighting Requirements and Capabilities - OPNAV N9), 2020.
Warning: These citations may not always be 100% accurate.