Operating experience regarding impacts on site electric power distribution from inadequate oversight of contractor activities.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, DC :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation : Office of New Reactors,
2016.
|
| Series: | NRC information notice ;
2016-07. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo157808 |
Similar Items
Inadequate oversight of contractors during sealant injection activities.
Published: (1997)
Published: (1997)
Operating experience regarding electrical circuit breakers.
Published: (2007)
Published: (2007)
Electric power systems--inadequate control over design processes.
Published: (1988)
Published: (1988)
Inadequate fuse control programs.
Published: (1991)
Published: (1991)
Choosing a contractor.
Published: (1980)
Published: (1980)
Contractors Overseeing Contractors : Conflicts of Interest Undermine Accountability in Iraq /
Published: (2004)
Published: (2004)
Contractor safety.
Published: (2014)
Published: (2014)
Electric power distribution for industrial plants.
Published: (1969)
Published: (1969)
Controls over equipment acquired by security contractors.
Published: (2005)
Published: (2005)
A contractor's survival guide : managing with confidence /
by: Schleifer, Thomas C., 1942-
Published: (1987)
by: Schleifer, Thomas C., 1942-
Published: (1987)
Quantifying the cumulative impact of change orders for electrical and mechanical contractors /
Published: (2000)
Published: (2000)
NASA's Space Flight Operations Contract and Other Technologically Complex Government Activities Conducted by Contractors /
by: Adedji, Adebayo
Published: (2003)
by: Adedji, Adebayo
Published: (2003)
Misapplication and inadequate testing of molded-case circuit breakers.
Published: (1992)
Published: (1992)
Innovative contractor compensation /
Published: (1998)
Published: (1998)
Inadequate fault interrupting raring of breakers.
Published: (2006)
Published: (2006)
Electrical power transmission and distribution : aging and life extension techniques /
by: Chudnovsky, Bella H.
Published: (2013)
by: Chudnovsky, Bella H.
Published: (2013)
Contractor combatant : tales of an embedded capitalist /
by: Andress, Carter, 1963-
Published: (2007)
by: Andress, Carter, 1963-
Published: (2007)
Electric power distribution equipment and systems /
by: Short, T. A. (Tom A.), 1966-
Published: (2005)
by: Short, T. A. (Tom A.), 1966-
Published: (2005)
Electrical distribution in papermills.
by: Witts, A. C. G.
Published: (1966)
by: Witts, A. C. G.
Published: (1966)
Plumbing contractor : start and run a money-making business /
by: Woodson, R. Dodge (Roger Dodge), 1955-
Published: (1993)
by: Woodson, R. Dodge (Roger Dodge), 1955-
Published: (1993)
Inadequate offsite power system voltages during design-basis events.
Published: (1995)
Published: (1995)
Contractor's support of U.S. operations in Iraq.
by: Frisk, Daniel
Published: (2008)
by: Frisk, Daniel
Published: (2008)
Superintending for the general contractor : field project mamagement /
by: Cook, Paul J. (Paul Jackson)
Published: (1987)
by: Cook, Paul J. (Paul Jackson)
Published: (1987)
Financial management for contractors /
Published: (1981)
Published: (1981)
The contractor's field guide /
by: Thomas, Paul I.
Published: (1991)
by: Thomas, Paul I.
Published: (1991)
Worldwide directory of consultants and contractors.
Published: (1991)
Published: (1991)
Be a successful building contractor /
by: Woodson, R. Dodge (Roger Dodge), 1955-
Published: (1997)
by: Woodson, R. Dodge (Roger Dodge), 1955-
Published: (1997)
Be a successful remodeling contractor /
by: Woodson, R. Dodge (Roger Dodge), 1955-
Published: (2005)
by: Woodson, R. Dodge (Roger Dodge), 1955-
Published: (2005)
Inadequate maintenance of uninterruptible power supplies and inverters.
Published: (1994)
Published: (1994)
Government is analyzing alternatives for contractor identification numbers /
by: Woods, William T.
Published: (2012)
by: Woods, William T.
Published: (2012)
inadequate work practices resulted in faulted circuit breaker connections.
Published: (2016)
Published: (2016)
Department of Defense contractors in Afghanistan and Iraq : background analysis /
by: Swain, Joyprada
Published: (2020)
by: Swain, Joyprada
Published: (2020)
A review of ICITAP's screening procedures for contractors sent to Iraq as correctional advisors.
Published: (2005)
Published: (2005)
Government equipment furnished to DOD contractors : hearing before a subcommittee of the Committee on Government Operations, House of Representatives, Ninety-ninth Congress, second session, March 20, 1986.
Published: (1986)
Published: (1986)
The top 400 contractors sourcebook.
Published: (1998)
Published: (1998)
Inadequate testing of emergency bus undervoltage logic circuitry.
Published: (1992)
Published: (1992)