Steam generator channel head and tubesheet degradation.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation : Office of New Reactors,
2013.
|
| Series: | NRC information notice ;
2013-20. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo157502 |
Similar Items
Steam generator overfill.
Published: (1981)
Published: (1981)
Inservice inspection deficiencies result in severely degraded steam generator tubes.
Published: (1994)
Published: (1994)
Operational experience on steam generator tube leaks and tube ruptures.
Published: (1994)
Published: (1994)
Foreign objects in steam generators.
Published: (1988)
Published: (1988)
Steam generator feedwater distribution piping damage.
Published: (1991)
Published: (1991)
Second U.S. Nuclear Regulatory Commission international steam generator tube integrity research program : final project summary report /
Published: (2003)
Published: (2003)
Degradation of steam generator internals.
Published: (1997)
Published: (1997)
Tube-to-tube contact resulting in wear in once-through steam generators.
Published: (2012)
Published: (2012)
Cracking of the upper shell-to-transition cone girth welds in steam generators.
Published: (1990)
Published: (1990)
Steam generator tube ruptures at two PWR facilities.
Published: (1979)
Published: (1979)
Potential failure of Westinghouse steam generator tube mechanical plugs.
Published: (1989)
Published: (1989)
Congressional request for information concerning steam generator tube integrity.
Published: (1982)
Published: (1982)
Operation with steam generator tubes seriously degraded.
Published: (1992)
Published: (1992)
Draft NUREG-1477, "Voltage-based interim plugging criteria for steam generator tubes".
Published: (1993)
Published: (1993)
Problems with the reliable detection of intergranular attack (IGA) of steam generator tubing.
Published: (1991)
Published: (1991)
Steam generators for nuclear power plants /
Published: (2025)
Published: (2025)
Potential problem with main steamline break analysis for main steam vaults/tunnels.
Published: (1993)
Published: (1993)
Steam Generators for Nuclear Power Plants.
by: Riznic, Jovica
Published: (2017)
by: Riznic, Jovica
Published: (2017)
Industrial boilers and heat recovery steam generators : design, applications, and calculations /
by: Ganapathy, V.
Published: (2003)
by: Ganapathy, V.
Published: (2003)
Industrial Boilers and Heat Recovery Steam Generators: Vol. 149: Design, Applications, and Calculations.
by: Ganapathy, V.
Published: (2002)
by: Ganapathy, V.
Published: (2002)
Potential steam generator related generated requirements.
Published: (1982)
Published: (1982)
Steam line break analysis using RELAP5/MOD3.3 for steam generator blowdown load assessment /
by: Jung, Han-Sik
Published: (2017)
by: Jung, Han-Sik
Published: (2017)
Recent incidents involving rapid increases in primary-to-secondary leak rate.
Published: (1991)
Published: (1991)
Buildup of deposits in steam generators.
Published: (2007)
Published: (2007)
Feedwater line break analysis using RELAP5/MOD3.3 for steam generator blowdown load assessment /
by: Jung, Han-Sik
Published: (2016)
by: Jung, Han-Sik
Published: (2016)
Steam generator tube inspection techniques.
Published: (1997)
Published: (1997)
Steam generator tube integrity and associated technical specifications.
Published: (2006)
Published: (2006)
Supplemental information to Generic Letter 95-03 "Circumferential cracking of steam generator tubes".
Published: (1995)
Published: (1995)
Steam generator tube integrity issues : pressurization rate effects, failure maps, leak rate correlation models, and leak rates in restricted areas /
Published: (2009)
Published: (2009)
Potential inconsistency in the assessment of the radiological consequences of a main steam line break associated with the implementation of steam generator tube voltage-based repair criteria.
Published: (1997)
Published: (1997)
Crack growth in steam generator girth welds.
Published: (1985)
Published: (1985)
Tube leakage due to a fabrication flaw in a replacement steam generator.
Published: (2004)
Published: (2004)
Stability of circumferential flaws in once-through steam generator tubes under thermal loading during LOCA, MSLB, and FWLB /
by: Majumdar, S. (Saurindranath)
Published: (2017)
by: Majumdar, S. (Saurindranath)
Published: (2017)
Steam generator tube degradation at Diablo Canyon.
Published: (2003)
Published: (2003)
Non-destructive and failure evaluation of tubing from a retired steam generator /
Published: (2007)
Published: (2007)
Circumferential cracking of steam generator tubes.
Published: (1995)
Published: (1995)
Internal combustion and steam plant in combination.
Published: (1987)
Published: (1987)
Weaknesses in plant-specific emergency operating procedures for refilling the secondary side of dry once-through steam generators.
Published: (1997)
Published: (1997)
Weakness in emergency operating procedures found as result of steam generator tube rupture.
Published: (1993)
Published: (1993)
Chemical cleaning of steam generators at Millstone 2.
Published: (1985)
Published: (1985)