Reactor vessel closure head studs remained detensioned during plant startup.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, DC :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation : Office of New Reactors,
2012.
|
| Series: | NRC information notice ;
2012-21. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo157307 |
Similar Items
Research reactor modernization and refurbishment.
Published: (2009)
Published: (2009)
Materials and inspections for reactor vessel closure studs.
Published: (2010)
Published: (2010)
Active working on reactors : proceedings of the joint international discussion meeting organized by the British Nuclear Energy Society in association with the Institution of Mechanical Engineers, 1 October 1970.
Published: (1971)
Published: (1971)
Heavy component replacement in nuclear power plants : experience and guidelines.
Published: (2008)
Published: (2008)
Incorrect maintenance procedure on traversing incore probe lines.
Published: (1986)
Published: (1986)
Overexposure of diver in pressurized water reactor (PWR) refueling cavity.
Published: (1984)
Published: (1984)
Maintenance, periodic testing and inspection of research reactors : safety guide /
Published: (2006)
Published: (2006)
Metal-clad circuit breaker maintenance issues identified by NRC inspections.
Published: (1998)
Published: (1998)
Potential problems with metal-clad circuit breakers, General Electric type AK-2-25.
Published: (1987)
Published: (1987)
Ageing management for nuclear power plants : safety guide.
Published: (2009)
Published: (2009)
Failure of steam generator primary side manway closure studs.
Published: (1982)
Published: (1982)
Loose parts in the secondary side of steam generators at pressurized water reactors.
Published: (1983)
Published: (1983)
Risk impact study regarding maintenance during low-power operation and shutdown.
Published: (1995)
Published: (1995)
Use of lifted leads and jumpers during maintenance or surveillance testing.
Published: (1984)
Published: (1984)
Auswechselvorrichtungen und -verfahren am Astra-Forschungs- udn Testreaktor /
by: Higatsberger, Michael J.
Published: (1964)
by: Higatsberger, Michael J.
Published: (1964)
Assessment and management of ageing of major nuclear power plant components important to safety : BWR pressure vessel internals.
Published: (2005)
Published: (2005)
Degradation of reactor coolant pump studs.
Published: (1980)
Published: (1980)
Inadvertent reduction in primary coolant inventory in boiling water reactors during shutdown and startup.
Published: (1984)
Published: (1984)
Interim procedures for NRC management of plant-specific backfitting.
Published: (1984)
Published: (1984)
Reactor operation /
by: Shaw, John, 1931 May 10-
Published: (1969)
by: Shaw, John, 1931 May 10-
Published: (1969)
Unplanned return to criticality during reactor shutdown.
Published: (1992)
Published: (1992)
Assessment and management of ageing of major nuclear power plant components important to safety : BWR pressure vessels.
Published: (2005)
Published: (2005)
Physics of nuclear reactors /
Published: (2021)
Published: (2021)
Problems with the use of unshielded test leads in reactor protection system circuitry.
Published: (1993)
Published: (1993)
Partial bypass of shutdown cooling flow from the reactor vessel.
Published: (1996)
Published: (1996)
Nuclear reactor engineering /
by: Glasstone, Samuel, 1897-1986
Published: (1994)
by: Glasstone, Samuel, 1897-1986
Published: (1994)
Nuclear reactor plant data.
Published: (1958)
Published: (1958)
Nuclear reactor plant data.
Published: (1959)
Published: (1959)
Control of Nuclear reactors and power plants.
by: Schultz, Mortimer A., 1918-
Published: (1955)
by: Schultz, Mortimer A., 1918-
Published: (1955)
Inadequate control of reactor coolant system conditions during shutdown.
Published: (1993)
Published: (1993)
Welding problems during fabrication of reactor plant components.
Published: (2013)
Published: (2013)
Procedural guidance for pipe replacement at BWRS.
Published: (1984)
Published: (1984)
Cracking of vertical welds in the core shroud and degraded repair.
Published: (1997)
Published: (1997)
Elementary reactor physics
by: Grant, Peter John, 1926-
Published: (1966)
by: Grant, Peter John, 1926-
Published: (1966)
Control of nuclear reactors and power plants.
by: Schultz, Mortimer A., 1918-
Published: (1961)
by: Schultz, Mortimer A., 1918-
Published: (1961)
Introductory nuclear reactor dynamics /
by: Ott, Karl O. (Karl Otto), 1925-
Published: (1985)
by: Ott, Karl O. (Karl Otto), 1925-
Published: (1985)
Recent events involving reactor coolant system inventory control during shutdown.
Published: (1997)
Published: (1997)
Maintenance welding in nuclear power plants : proceedings of a conference, August 7-8, 1979, Atlanta /
Published: (1980)
Published: (1980)
Introductory nuclear reactor statics /
by: Ott, Karl O. (Karl Otto), 1925-
Published: (1989)
by: Ott, Karl O. (Karl Otto), 1925-
Published: (1989)
Handbook of small modular nuclear reactors /
Published: (2021)
Published: (2021)