Inappropriate use of certified material test report yield stress and age-hardened concrete compressive strength in design calculations.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, DC :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation : Office of New Reactors : Office of Nuclear Material Safety and Safeguards : Office of Federal and State Materials and Environmental Management Programs,
2012.
|
| Series: | NRC information notice ;
2012-17. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo157302 |
Similar Items
Use of inappropriate guidelines and criteria for nuclear piping and pipe support evaluation and design.
Published: (1995)
Published: (1995)
Use of inappropriate lubrication oils in safety-related applications.
Published: (1993)
Published: (1993)
Fire in compressible material at Dresden Unit 3.
Published: (1986)
Published: (1986)
Inappropriate application of commercial-grade components.
Published: (1987)
Published: (1987)
Assessment of age-related degradation of structures and passive components for U.S. nuclear power plants /
Published: (2000)
Published: (2000)
Inappropriate use of 10 CFR 50.59 regarding reduced seismic criteria for temporary conditions.
Published: (1997)
Published: (1997)
Evaluation of JNES equipment fragility tests for use in seismic probability risk assessments for U.S. nuclear power plants /
by: Kennedy, R.
Published: (2011)
by: Kennedy, R.
Published: (2011)
Material degradation and related managerial issues at nuclear power plants : proceedings of a technical meeting /
Published: (2006)
Published: (2006)
Proactive management of ageing for nuclear power plants.
Published: (2009)
Published: (2009)
Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants : draft report for comment /
by: Bedi, Gurjendra S.
Published: (2011)
by: Bedi, Gurjendra S.
Published: (2011)
Analysis of JNES seismic tests on degraded piping /
Published: (2010)
Published: (2010)
Qualification of inspection, examination, testing and audit personnel.
Published: (1981)
Published: (1981)
Glossary of nuclear power plant ageing = Glossaire du vieillissement des centrales nucléaires /
Published: (1999)
Published: (1999)
Maintenance, periodic testing and inspection of research reactors : safety guide /
Published: (2006)
Published: (2006)
Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report /
by: Bedi, Gurjendra S.
Published: (2013)
by: Bedi, Gurjendra S.
Published: (2013)
Stress corrosion cracking in PWR steam generator tubes.
Published: (1990)
Published: (1990)
Stress analysis of safety-related piping.
Published: (1979)
Published: (1979)
Method of calculating the cost of electricity generation from nuclear and conventional thermal stations /
Published: (1979)
Published: (1979)
External human induced events in site evaluation for nuclear power plants : safety guide.
Published: (2002)
Published: (2002)
Core knowledge on instrumentation and control systems in nuclear power plants.
Published: (2011)
Published: (2011)
Best practices in identifying, reporting and screening operating experience at nuclear power plants.
Published: (2008)
Published: (2008)
Commissioning of nuclear power plants : training and human resource considerations.
Published: (2008)
Published: (2008)
Managing human resources in the field of nuclear energy.
Published: (2009)
Published: (2009)
Power uprate in nuclear power plants : guidelines and experience /
Published: (2011)
Published: (2011)
Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants.
Published: (2008)
Published: (2008)
Protection against Internal Hazards in the Design of Nuclear Power Plants.
by: IAEA
Published: (2021)
by: IAEA
Published: (2021)
Integration of analog and digital instrumentation and control systems in hybrid control rooms.
Published: (2010)
Published: (2010)
Nuclear Power Reactors Other Than Soviet Without U.S. Type Secondary Containment.
Published: (1986)
Published: (1986)
Lessons learned from nuclear energy system assessments (NESA) using the inpro methodology : a report of the international project on innovative nuclear reactors and fuel cycles (INPRO) /
Published: (2009)
Published: (2009)
Country nuclear power profiles /
Published: (2011)
Published: (2011)
Country nuclear power profiles /
Published: (2010)
Published: (2010)
Recent snubber inservice testing with high failure rates.
Published: (1984)
Published: (1984)
Maintaining the design integrity of nuclear installations throughout their operating life /
Published: (2003)
Published: (2003)
Intergranular stress corrosion cracking leading to steam generator tube failure.
Published: (1984)
Published: (1984)
Inservice testing of pumps and valves, and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants : draft report for comment /
by: Tingen, S. G.
Published: (2010)
by: Tingen, S. G.
Published: (2010)
Improperly installed instrumentation, inadequate quality control and inadequate postmodification testing.
Published: (1985)
Published: (1985)
Incomplete medical testing for licensed operators.
Published: (2009)
Published: (2009)
Regulatory guide 1.197 : demonstrating control room envelope integrity at nuclear power reactors.
Published: (2003)
Published: (2003)
Regulatory guide 1.196 : control room habitability at light-water nuclear power reactors.
Published: (2007)
Published: (2007)
Elements of an approach to performance-based regulatory oversight /
Published: (1999)
Published: (1999)