Westinghouse ECCS evaluation models.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission,
1986.
|
| Series: | Generic letter ;
no. 86-16. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo155702 |
Similar Items
Effect of a DC power supply failure on ECCS performances.
Published: (1980)
Published: (1980)
Report on ECCS cladding models, NUREG-0630.
Published: (1980)
Published: (1980)
ECCS calculations on fuel cladding.
Published: (1979)
Published: (1979)
Design deficiencies can lead to reduced ECCS pump net positive suction head during design-basis accidents.
Published: (1998)
Published: (1998)
Degradation of automatic ECCS actuation capability by isolation of instrument lines.
Published: (1981)
Published: (1981)
Potential common cause vulnerabilities in essential service water systems.
Published: (2007)
Published: (2007)
Potential common cause vulnerabilities in essential service water systems due to inadequate chemistry controls.
Published: (2007)
Published: (2007)
Failure to consider loss of DC bus in the emergency core cooling system evaluation may lead to nonconservative analysis.
Published: (1993)
Published: (1993)
Recent operating experience of service water systems due to external conditions.
Published: (2006)
Published: (2006)
Actuation of ECCS in the recirculation mode while in hot shutdown.
Published: (1980)
Published: (1980)
Potential clogging of high pressure safety injection throttle valves during recirculation.
Published: (1996)
Published: (1996)
Effects of insulation debris on throttle-valve flow performance : a subtask of GSI-191 /
Published: (2006)
Published: (2006)
Realistic emergency core cooling system evaluation model effects resulting from nuclear fuel thermal conductivity degradation.
Published: (2011)
Published: (2011)
Potentially inadequate performance of ECCS in PWRs during recirculation operation following a LOCA.
Published: (1988)
Published: (1988)
Managing gas accumulation in emergency core cooling, decay heat removal, and containment spray systems.
Published: (2008)
Published: (2008)
HPCI/RCIC high steam flow setpoints.
Published: (1982)
Published: (1982)
Potential for loss of minimum flow paths leading to ECCS pump damage during a LOCA.
Published: (1985)
Published: (1985)
Foreign material found in the emergency core cooling system.
Published: (2006)
Published: (2006)
Knowledge base for the effect of debris on pressurized water reactor emergency core cooling sump performance /
Published: (2003)
Published: (2003)
Safety aspects of the Yankee Rowe Nuclear Powerplant : oversight hearing before the Subcommittee on Energy and the Environment of the Committee on Interior and Insular Affairs, House of Representatives, One Hundred Second Congress, first session ... hearing held in Washington, DC, August 1, 1991.
Published: (1992)
Published: (1992)
Reactor vessel top guide and core plate cracking.
Published: (1995)
Published: (1995)
Characterization and head-loss testing of latent debris from pressurized-water-reactor containment buildings /
Published: (2005)
Published: (2005)
Fire protection system design deficiencies and common-mode flooding of emergency core cooling system rooms at Washington Nuclear Project Unit 2.
Published: (1998)
Published: (1998)
Degradation of Westinghouse ARD relays.
Published: (1988)
Published: (1988)
Loss of vital AC power with subsequent reactor coolant system heat-up.
Published: (1990)
Published: (1990)
Inadvertent loss of capability for emergency core cooling system motors.
Published: (1997)
Published: (1997)
Incorrect unreviewed safety question determination related to emergency core cooling system swapover from the injection mode to the recirculation mode.
Published: (1997)
Published: (1997)
Operating experience regarding entrainment of air into emergency core cooling and containment spray systems.
Published: (2006)
Published: (2006)
Excessive temperatures in emergency core cooling system piping located outside containment.
Published: (1989)
Published: (1989)
Problems with levering-in devices in Westinghouse circuit breakers.
Published: (1996)
Published: (1996)
Emergency net positive suction head of emergency core cooling and containment heat removal pumps under design basis accident conditions.
Published: (1996)
Published: (1996)
GI-23, "Reactor coolant pump seal failures" and its possible effect on station blackout.
Published: (1991)
Published: (1991)
Westinghouse NBFD relay failures in reactor protection systems.
Published: (1982)
Published: (1982)
Assurance of sufficient net positive suction head for emergency core cooling and containment heat removal pumps.
Published: (1997)
Published: (1997)
Failure of Westinghouse W-2-type circuit breaker cell switches.
Published: (1987)
Published: (1987)
RHR valve misalignment causes degradation of ECCS in PWRS.
Published: (1987)
Published: (1987)
Failure of undervoltage trip attachment on Westinghouse Model DE-50 reactor trip breaker.
Published: (1993)
Published: (1993)
Capacitor failures in Westinghouse Eagle 21 plant protection systems.
Published: (1994)
Published: (1994)
Miswiring in a Westinghouse rod control system.
Published: (1987)
Published: (1987)
Potential problems in Westinghouse molded case circuit breakers equipped with a shunt trip.
Published: (1986)
Published: (1986)