Technical specifications for Generic Letter 83-28, items 4.3 and 4.4.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission,
1985.
|
| Series: | Generic letter ;
no. 85-10. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo155613 |
Similar Items
Technical specifications for Generic Letter 83-28, item 4.3.
Published: (1985)
Published: (1985)
Required actions based on generic implications of Salem ATWS events.
Published: (1983)
Published: (1983)
Transient resulting in a reactor trip and multiple safety injection system actuations at Salem.
Published: (1994)
Published: (1994)
Generic environmental impact statement for license of nuclear plants. regarding Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2.
Published: (2011)
Published: (2011)
Loss of offsite power to vital-buses at Salem 2.
Published: (1986)
Published: (1986)
Transmittal of NUREG-0977 relative to the ATWS events at Salem Generating Station, Unit No. 1.
Published: (1983)
Published: (1983)
Safety evaluation report related to the license renewal of Salem Nuclear Generating Satation.
Published: (2011)
Published: (2011)
Nuclear service water piping : the Salem Nuclear Generating Station of the Public Service Electric & Gas Company, New Jersey, U.S.A.
Published: (1995)
Published: (1995)
Generic environmental impact statement for license renewal of nuclear plants : supplement 28, regarding Oyster Creek Nuclear Generating Station, final report.
Published: (2007)
Published: (2007)
Misapplication of generic emergency operating procedures (EOP) guidelines.
Published: (1983)
Published: (1983)
Line-item improvements in technical specifications--removal of the 3.25 limit on extending surveillance intervals.
Published: (1989)
Published: (1989)
Availability of supplement 4 to NUREG-0933, "A Prioritization of generic safety issues".
Published: (1986)
Published: (1986)
Safety evaluation report related to the license renewal of Hope Creek Generating Station : docket no. 50-354 : PSEG Nuclear, LLC.
Published: (2011)
Published: (2011)
Development and review of plant specific emergency operating procedures.
Published: (2006)
Published: (2006)
Nuclear Power Reactors Other Than Soviet Without U.S. Type Secondary Containment.
Published: (1986)
Published: (1986)
Reliability of ATWS mitigation systems and other NRC-required equipment not controlled by plant technical specifications.
Published: (1992)
Published: (1992)
RELAP5/MOD3.3 assessment against PMK test T3.1 -- LBLOCA with nitrogen in PRZ /
by: Král, Pavel
Published: (2010)
by: Král, Pavel
Published: (2010)
Reports of the Technical Assessment Task Force.
Published: (1979)
Published: (1979)
RELAP5/MOD3.3 analysis of steam generator tube rupture (SGTR) accident for NPP Krško /
by: Benčik, V., et al.
Published: (2014)
by: Benčik, V., et al.
Published: (2014)
Nuclear accident /
by: Lampton, Christopher
Published: (1992)
by: Lampton, Christopher
Published: (1992)
NRC staff recommendations regarding operator action for reactor trip and ATWS.
Published: (1983)
Published: (1983)
Funding of Local Emergency Planning Activities for Nuclear Power Plants.
Published: (1985)
Published: (1985)
Nuclear Power Plant Safety and Licensing.
Published: (1984)
Published: (1984)
Mitigation of hydrogen hazards in severe accidents in nuclear power plants.
Published: (2011)
Published: (2011)
Reactor trips at Turkey Point Units 3 and 4.
Published: (1979)
Published: (1979)
RELAP5/MOD3.3 analysis of event with actuation of safety injection system at the loss of external power /
by: Proŝek, A., et al.
Published: (2015)
by: Proŝek, A., et al.
Published: (2015)
Line-item technical specifications improvements to reduce surveillance requirements for testing during power operation.
Published: (1993)
Published: (1993)
Generic environmental impact statement for license renewal of nuclear plants : supplement 5, second renewal, regarding subsequent license renewal for Turkey Point Nuclear Generating Units nos. 3 and 4, draft report for comment.
Published: (2019)
Published: (2019)
Removal of component lists from technical specifications.
Published: (1991)
Published: (1991)
Generic technical activity A-12 fracture toughness.
Published: (1980)
Published: (1980)
NUREG-0737 technical specifications.
Published: (1982)
Published: (1982)
Velocity distribution study, forced draft air duct, Salem Harbor Station unit no. 4 /
by: Hecker, George E.
Published: (1972)
by: Hecker, George E.
Published: (1972)
Severe accident management programmes for nuclear power plants : safety guide /
Published: (2009)
Published: (2009)
Inadvertent defeat of safety function caused by human error involving wrong unit, wrong train, or wrong system.
Published: (1984)
Published: (1984)
Reactor trips resulting from water intrusion into electrical equipment.
Published: (2011)
Published: (2011)
Trending of low level events and near misses to enhance safety performance in nuclear power plants.
Published: (2005)
Published: (2005)
Multiple-subsequent actuation of safety/relief valves following an isolation event.
Published: (1978)
Published: (1978)
Emergency response data system.
Published: (1989)
Published: (1989)
Generic environmental impact statement for license renewal of nuclear plants.
by: Beasley, Bejnamin
Published: (2018)
by: Beasley, Bejnamin
Published: (2018)
Generic environmental impact statement for license renewal of nuclear plants.
Published: (2016)
Published: (2016)