IEB 80-17 supplement 4, failure of control rods to insert during a scram at a BWR.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C :
United States Nuclear Regulatory Commission, Office of Inspection and Enforcement,
1980.
|
| Series: | Generic letter ;
80-111. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo154442 |
Similar Items
IEB 80-17 supplement 1 failure of control rods to insert during a scram at a BWR.
Published: (1980)
Published: (1980)
Alternate rod Insertion for BWR scram represents a potential path for loss of primary coolant.
Published: (1981)
Published: (1981)
BWR scram system.
Published: (1980)
Published: (1980)
BWR scram discharge system.
Published: (1980)
Published: (1980)
BWR scram discharge system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1985)
Published: (1985)
BWR post-scram drywell pressurization.
Published: (1984)
Published: (1984)
Potential for unacceptable interaction between the control rod drive scram function and non-essential control air at certain GE BWR facilities.
Published: (1980)
Published: (1980)
BWR scram discharge system, clarification of diverse instrumentation requirement.
Published: (1981)
Published: (1981)
Potential failure of BWR backup manual scram capability.
Published: (1980)
Published: (1980)
BWR control rod failures.
Published: (1980)
Published: (1980)
BWR high-pressure coolant injection (HPCI) initiation seal-in and indication.
Published: (1984)
Published: (1984)
Potential failure of all control rod groups to insert in a bolling water reactor due to a fire.
Published: (2007)
Published: (2007)
BWR anticipated transients without scram in the MELLLA+ expanded operating domain /
by: Cheng, Lap-Yan
Published: (2015)
by: Cheng, Lap-Yan
Published: (2015)
IEB 80-07 BWR jet pump assembly failure.
Published: (1980)
Published: (1980)
The establishment and assessment of Chinshan (BWR/4) Nuclear Power Plant TRACE/SNAP model /
by: Wang, Jong-Rong
Published: (2014)
by: Wang, Jong-Rong
Published: (2014)
Torus shells with corrosion and degraded coatings in BWR containments.
Published: (1988)
Published: (1988)
Modifications to boiling water reactor control rod drive systems.
Published: (1980)
Published: (1980)
Suppression pool temperature limits for BWR containments : generic technical activity A-39 /
by: Su, T. M.
Published: (1981)
by: Su, T. M.
Published: (1981)
Hydrogen combustion events in foreign BWR piping.
Published: (2002)
Published: (2002)
Failures of scram discharge volume vent and drain valves.
Published: (1986)
Published: (1986)
Scram discharge volume.
Published: (1980)
Published: (1980)
Fuel movement with control rods withdrawn at BWRS.
Published: (1983)
Published: (1983)
Partial plugging of suppression pool strainers at a foreign BWR.
Published: (1992)
Published: (1992)
BWR feedwater nozzle and control rod drive return line nozzle cracking (NUREG-0619).
Published: (1981)
Published: (1981)
The development and application of Kuosheng (BWR/6) nuclear power plant TRACE/SNAP model /
by: Shih, Chunkuan
Published: (2014)
by: Shih, Chunkuan
Published: (2014)
Implementation of NUREG-0313, technical report on material selection & processing GL for BWR coolant press boundary piping.
Published: (1981)
Published: (1981)
Impact of operating parameters on extended BWR burnup credit /
by: Ade, Brian J.
Published: (2018)
by: Ade, Brian J.
Published: (2018)
Inspections of BWR stainless steel piping.
Published: (1984)
Published: (1984)
Scram discharge volume designs.
Published: (1980)
Published: (1980)
Investigation of distorted-geometry simulation of pool dynamics in horizontal-vent BWR containments /
by: Ruggieri, N. G., et al.
Published: (1980)
by: Ruggieri, N. G., et al.
Published: (1980)
The alternate mitigation strategies study of Chinshan BWR/4 by using the LOCA and SBO analysis of TRACE /
by: Wang, Jong-Rong
Published: (2014)
by: Wang, Jong-Rong
Published: (2014)
Anomalous behavior of recirculation loop plow in jet pump BWR plants.
Published: (1986)
Published: (1986)
Generic activity A-10 BWR cracks.
Published: (1980)
Published: (1980)
Guidance on order issued January 9, 1981 regarding automatic control rod insertion on low control air pressure.
Published: (1981)
Published: (1981)
Torus cracking in a BWR mark 1 containment.
Published: (2006)
Published: (2006)
BWR ECCS pump suction concerns following a LOCA /
by: Krotiuk, W. J.
Published: (2016)
by: Krotiuk, W. J.
Published: (2016)