Generic activity A-10.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission,
1980.
|
| Series: | Generic letter ;
80-95. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo154425 |
Similar Items
Generic activity A-10 BWR cracks.
Published: (1980)
Published: (1980)
Availability of NUREG-1169, "Technical findings related to Generic Issue C-8; boiling water reactor main steam isolation valve leakage and leakage treatment methods".
Published: (1986)
Published: (1986)
Cracks found in jet pump riser assembly elbows at boiling water reactors.
Published: (1997)
Published: (1997)
IGSCC in BWR plants.
Published: (1984)
Published: (1984)
Intergranular stress corrosion cracking leading to steam generator tube failure.
Published: (1984)
Published: (1984)
Implementation of NUREG-0313, technical report on material selection & processing GL for BWR coolant press boundary piping.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1985)
Published: (1985)
Safety concerns associated with pipe breaks in the BWR scram system.
Published: (1981)
Published: (1981)
BWR feedwater nozzle and control rod drive return line nozzle cracking (NUREG-0619).
Published: (1981)
Published: (1981)
Potential for stress corrosion cracking in steam generator tube plugs supplied by Babcock and Wilcox.
Published: (1989)
Published: (1989)
Undetected installation errors in main steam line pipe tunnel differential temperature-sensing elements at boiling water reactors.
Published: (1989)
Published: (1989)
NRC position on IGSCC in BWR austenitic stainless steel piping.
Published: (1988)
Published: (1988)
Core shroud cracking at beltline region welds in boiling-water reactors.
Published: (1993)
Published: (1993)
Cracking in the lower region of the core shroud in boiling water reactors.
Published: (1994)
Published: (1994)
Crack growth rates of irradiated austenitic stainless steel weld heat affected zone in BWR environments /
Published: (2006)
Published: (2006)
Failure of a boiling water reactor target rock main steam safety/relief valve.
Published: (2003)
Published: (2003)
Assessment and management of ageing of major nuclear power plant components important to safety : BWR pressure vessels.
Published: (2005)
Published: (2005)
Pipe cracking in U.S. BWRs : a regulatory history /
by: Strosnider Jr., J. R.
Published: (2000)
by: Strosnider Jr., J. R.
Published: (2000)
Anomalous behavior of recirculation loop plow in jet pump BWR plants.
Published: (1986)
Published: (1986)
Boiling water reactor safety/relief valve failures.
Published: (1983)
Published: (1983)
Cracking in boiling-water-reactor Mark I and Mark II containments caused by failure of the inerting system.
Published: (1985)
Published: (1985)
Service degradation of thick wall stainless steel recirculation system piping at a BWR plant.
Published: (1982)
Published: (1982)
Cracking in main steam lines.
Published: (1981)
Published: (1981)
Hydrogen combustion events in foreign BWR piping.
Published: (2002)
Published: (2002)
Inspections of BWR stainless steel piping.
Published: (1984)
Published: (1984)
Technical resolution of Generic Issue No. B-59-(N-1) loop operation in BWRs and PWRs.
Published: (1986)
Published: (1986)
Resolution of generic issue 101 "Boiling water reactor water level redundancy".
Published: (1989)
Published: (1989)
Procedural guidance for pipe replacement at BWRS.
Published: (1984)
Published: (1984)
Failure of steam dryer cover plate after a recent power uprate.
Published: (2002)
Published: (2002)
Cracking of valves in the condensate return lines of a BWR emergency condensation system.
Published: (1992)
Published: (1992)
Higher than predicted erosion/corrosion in unisolable reactor coolant pressure boundary coolant inside containment at a boiling water reactor.
Published: (1992)
Published: (1992)
Degraded ability to isolate the reactor coolant system from low-pressure coolant systems in BWRS.
Published: (1986)
Published: (1986)
Failures to identify containment leakage due to inadequate local testing of BWR vacuum relief system valves.
Published: (1986)
Published: (1986)
TRACE (V 5.0 Patch 2) validation based on the RELAP5-Calculation of FIX-III LOCA experiments no. 5052, 4011, 3051 /
by: Sheng, S. ChunHong
Published: (2014)
by: Sheng, S. ChunHong
Published: (2014)
Failures of scram discharge volume vent and drain valves.
Published: (1986)
Published: (1986)
Circumferential cracking of steam generator tubes.
Published: (1995)
Published: (1995)
An experimental and modelling study of natural-circulation boiling water reactor dynamics /
by: Zboray, Robert
Published: (2002)
by: Zboray, Robert
Published: (2002)
Technical resolution of Generic Issue B-19-thermal hydraulic stability.
Published: (1985)
Published: (1985)