Significant unexpected erosion of feedwater lines.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,
1987.
|
| Series: | Information notice ;
no. 87-36. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo149406 |
Similar Items
Failure of auxiliary feedwater manual isolation valve.
Published: (1986)
Published: (1986)
Overspeed of the turbine-driven auxiliary feedwater pumps and overpressurization of the associated piping systems.
Published: (1990)
Published: (1990)
Single failures in auxiliary feedwater systems.
Published: (1987)
Published: (1987)
Thermal stratification in feedwater system piping.
Published: (1991)
Published: (1991)
Rapid flow-induced erosion/corrosion of feedwater piping.
Published: (1992)
Published: (1992)
Feedwater line break.
Published: (1986)
Published: (1986)
Disablement of turbine-driven auxiliary feedwater pump due to closure of one of the parallel steam supply valves.
Published: (1989)
Published: (1989)
Cracking In feedwater lines.
Published: (1979)
Published: (1979)
Inoperability of auxiliary and emergency feedwater auto-start circuits on loss of main feedwater pumps.
Published: (2015)
Published: (2015)
Failure of main feedwater check valves causes loss of feedwater system integrity and water-hammer damage.
Published: (1986)
Published: (1986)
Failure of main feedwater check valves causes loss of feedwater system integrity and water-hammer damage.
Published: (1986)
Published: (1986)
Undetected unavailability of the turbine-driven auxiliary feedwater train.
Published: (1984)
Published: (1984)
Steam generator feedwater distribution piping damage.
Published: (1991)
Published: (1991)
Cracking In feedwater system piping.
Published: (1991)
Published: (1991)
Unisolable crack in high-pressure injection piping.
Published: (1997)
Published: (1997)
Temporary strainers left installed in pump suction piping.
Published: (1985)
Published: (1985)
Degradation or loss of charging systems at PWR nuclear power plants using swing-pump designs.
Published: (1986)
Published: (1986)
Thermal fatigue cracking of feedwater piping to steam generators.
Published: (1993)
Published: (1993)
Main feedwater system degradation in safety-related ASME code class 2 piping inside the containment of a pressurized water reactor.
Published: (2001)
Published: (2001)
Degradation of steam generator internals.
Published: (1997)
Published: (1997)
Degradation of reactor coolant pump studs.
Published: (1980)
Published: (1980)
Operating experience regarding entrainment of gas or debris into auxiliary feedwater systems.
Published: (2007)
Published: (2007)
Auxiliary feedwater pump lockout resulting from Westinghouse W-2 switch circuit modification.
Published: (1982)
Published: (1982)
Failure of turbine-driven main feedwater pump to trip because of contaminated oil.
Published: (1993)
Published: (1993)
Loss of feedwater isokinetic sampling probes at Dresden units 2 and 3.
Published: (2004)
Published: (2004)
Age-related constant support degradation.
Published: (2009)
Published: (2009)
Loss of suction to emergency feedwater pumps.
Published: (1980)
Published: (1980)
Erosion-corrosion of PWR feedwater piping survey of experience, design, water chemistry, and materials /
by: Jonas, Otakar
Published: (1988)
by: Jonas, Otakar
Published: (1988)
Fabrication flaw density and distribution in repairs to reactor pressure vessel and piping welds /
by: Schuster, G. J.
Published: (2008)
by: Schuster, G. J.
Published: (2008)
Failure of Rockwell-Edward main steam isolation valves.
Published: (1981)
Published: (1981)
Degradation of static "O" ring pressure switches.
Published: (1987)
Published: (1987)
Design deficiency in the turbine-driven auxiliary feedwater pump cooling water system.
Published: (1989)
Published: (1989)
Seismic qualification of auxiliary feedwater systems.
Published: (1981)
Published: (1981)
Seismic qualification of auxiliary feedwater systems.
Published: (1980)
Published: (1980)
Assessment of the "one feedwater pump trip transient" in Cofrentes Nuclear Power Plant with TRAC-BF1 /
by: Castrillo, F., et al.
Published: (1992)
by: Castrillo, F., et al.
Published: (1992)
Auxiliary feedwater pump trips resulting from low suction pressure.
Published: (1987)
Published: (1987)
Loss of suction to low-pressure service water system pumps resulting from loss of siphon.
Published: (1987)
Published: (1987)
Auxiliary feedwater pump recirculation line orifrice fouling-potential common cause failure.
Published: (2004)
Published: (2004)
Vibration-induced degradation and failure of safety-related valves.
Published: (2006)
Published: (2006)
Closed feedwater heaters for power generation : a working guide /
by: Yokell, Stanley, et al.
Published: (2015)
by: Yokell, Stanley, et al.
Published: (2015)