Actuation of fire suppression system causing inoperability of safety-related ventilation equipment.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Inspection and Enforcement,
1987.
|
| Series: | Information notice ;
no. 87-14. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo148958 |
Similar Items
Actuation of fire suppression system causing inoperability of safety-related equipment.
Published: (1983)
Published: (1983)
Nuclear power plant fire protection.
by: Milloy, John A.
Published: (1979)
by: Milloy, John A.
Published: (1979)
Potential circuit failure-induced secondary fires or equipment damage.
Published: (2014)
Published: (2014)
A summary of nuclear power plant fire safety research at Sandia National Laboratories, 1975-1987 /
by: Nowlen, S. P.
Published: (1989)
by: Nowlen, S. P.
Published: (1989)
Assessment of the overall fire safety arrangements at nuclear power plants.
Published: (1996)
Published: (1996)
Safety evaluation for operations of Browns Ferry, units 1 and 2, following the March 22, 1975, fire.
Published: (1976)
Published: (1976)
Fire safety in the operation of nuclear power plants : safety guide.
Published: (2000)
Published: (2000)
Inadequate fire suppression system testing.
Published: (1992)
Published: (1992)
Corrosion in fire protection piping due to air and water interaction.
Published: (2013)
Published: (2013)
Fire dynamics tools (FDTs) quantitative fire hazard analysis methods for the U.S. Nuclear Regulatory Commission fire protection inspection program : supplement 1 /
by: Stroup, D., et al.
Published: (2012)
by: Stroup, D., et al.
Published: (2012)
Fire protection in nuclear power plants : a safety guide.
Published: (1992)
Published: (1992)
Fire protection in nuclear power plants : a safety guide.
Published: (1979)
Published: (1979)
Fire protection.
Published: (1980)
Published: (1980)
Recommendations related to Browns Ferry fire /
by: Hanauer, Stephen H.
Published: (1976)
by: Hanauer, Stephen H.
Published: (1976)
Fire protection rule.
Published: (1980)
Published: (1980)
Risk methods insights gained from fire incidents /
by: Nowlen, S. P.
Published: (2001)
by: Nowlen, S. P.
Published: (2001)
Risk methods insights gained from fire incidents /
by: Nowlen, S. P.
Published: (2001)
by: Nowlen, S. P.
Published: (2001)
Compensatory and Alternative Regulatory MEasures for Nuclear power plant FIRE protection (CARMEN-FIRE) /
by: Sullivan, K. (Kenneth), 1950-
Published: (2015)
by: Sullivan, K. (Kenneth), 1950-
Published: (2015)
Supplement no. 1 to the safety evaluation by the Division of Operating Reactors supporting the operation after the restoration and modification of the Browns Ferry Nuclear Plant, units 1 and 2 following the March, 22, 1975 fire.
Published: (1976)
Published: (1976)
Compensatory and Alternative Regulatory MEasures for Nuclear power plant FIRE protection (CARMEN-FIRE) : draft report for comment /
by: Sullivan, K.
Published: (2013)
by: Sullivan, K.
Published: (2013)
Implementation of fire protection requirements.
Published: (1986)
Published: (1986)
Refining And Characterizing Heat Release Rates From Electrical Enclosures During Fire (RACHELLE-FIRE) : draft report for comment.
Published: (2015)
Published: (2015)
Fire safety of temporary installations or services.
Published: (1991)
Published: (1991)
Refining And Characterizing Heat Release Rates From Electrical Enclosures During Fire (RACHELLE-FIRE), final report.
Published: (2016)
Published: (2016)
A literature review of the effects of smoke from a fire on electrical equipment /
Published: (2012)
Published: (2012)
Potential fire damper operational problems.
Published: (1989)
Published: (1989)
Fire environment determination in the LaSalle Nuclear Power Plant control room /
by: Usher, J. L. (John L.), et al.
Published: (1987)
by: Usher, J. L. (John L.), et al.
Published: (1987)
Joint a̲ssessment of c̲able damage and q̲uantification of e̲ffects from fi̲r̲e̲ (JACQUE-FIRE) : final report.
Published: (2012)
Published: (2012)
Operating experience related to failure of buried fire protection main yard piping.
Published: (2020)
Published: (2020)
Improperly installed fire dampers at nuclear power plants.
Published: (1983)
Published: (1983)
Removal of fire protection requirements from technical specifications.
Published: (1988)
Published: (1988)
Fire dynamics tools (FDTs) : quantitative fire hazard analysis methods for the U.S. Nuclear Regulatory Commission fire protection inspection program : final report /
by: Iqbal, Naeem, et al.
Published: (2004)
by: Iqbal, Naeem, et al.
Published: (2004)
Nuclear power plant fire ignition frequency and non-suppression probability estimation using the updated fire events database : United States fire event experience through 2009 /
by: Melly, Nicholas, et al.
Published: (2015)
by: Melly, Nicholas, et al.
Published: (2015)
Evaluation of fire models for nuclear power plant applications, cable tray fires : international panel report /
Published: (2002)
Published: (2002)
Treatment of internal fires in probabilistic safety assessment for nuclear power plants.
Published: (1998)
Published: (1998)
Electrical arc flash caused by foreign material damages fire door.
Published: (2018)
Published: (2018)
The Browns Ferry Nuclear Plant fire of 1975 and the history of NRC fire regulations.
Published: (2009)
Published: (2009)
The Browns Ferry Nuclear Plant fire of 1975 and the history of NRC fire regulations /
Published: (2009)
Published: (2009)
Failure of THERMO-LAG fire barrier material to pass fire endurance test.
Published: (1991)
Published: (1991)
Browns Ferry Nuclear Plant fire : hearings before the Joint Committee on Atomic Energy, Congress of the United States, Ninety-fourth Congress, first session, September 16, 1975.
Published: (1975)
Published: (1975)