Unit startup with degraded high pressure safety injection system.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Inspection and Enforcement,
1986.
|
| Series: | Information notice ;
no. 86-80. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo148297 |
Similar Items
Undetected modification of flow characteristics in the high pressure safety Injection system.
Published: (1993)
Published: (1993)
Loss of high head safety injection.
Published: (1992)
Published: (1992)
RHR valve misalignment causes degradation of ECCS in PWRS.
Published: (1987)
Published: (1987)
Potential for gas binding of high-pressure safety injection pumps during a loss-of-coolant accident.
Published: (1988)
Published: (1988)
Main steam isolation valve guide rail failure at Waterford Unit 3.
Published: (1988)
Published: (1988)
Thermally induced pressure locking of a high pressure coolant injection valve.
Published: (1996)
Published: (1996)
Suceptibility of low-pressure coolant injection and core spray injection valves to pressure locking.
Published: (1995)
Published: (1995)
Loss of shutdown cooling during disassembly of high pressure safety injection system check valve.
Published: (1991)
Published: (1991)
Inadequate inservice testing of main steam isolation valves.
Published: (1985)
Published: (1985)
Degraded ability to isolate the reactor coolant system from low-pressure coolant systems in BWRS.
Published: (1986)
Published: (1986)
Changes In pressurizer safety valve setpoints before installation.
Published: (1991)
Published: (1991)
LWR primary coolant system pressure isolation valves.
Published: (1980)
Published: (1980)
Main steam isolation valve closure logic.
Published: (1985)
Published: (1985)
Failure of a boiling water reactor target rock main steam safety/relief valve.
Published: (2003)
Published: (2003)
Boiling water reactor safety/relief valve failures.
Published: (1983)
Published: (1983)
Pressurizer safety valve reliability.
Published: (1986)
Published: (1986)
Failures to identify containment leakage due to inadequate local testing of BWR vacuum relief system valves.
Published: (1986)
Published: (1986)
Excessive nitrogen supply pressure actuates safety-relief valve operation to cause reactor depressurization.
Published: (1980)
Published: (1980)
Degradation of scram solenoid pilot valve pressure and exhaust diaphragms.
Published: (1994)
Published: (1994)
Reversed differential pressure instrument sensing lines.
Published: (1984)
Published: (1984)
Failure of three check valves on high pressure injection lines to pass flow.
Published: (1982)
Published: (1982)
Potential error in high steamline flow setpoint.
Published: (1990)
Published: (1990)
Failure of safety injection valves to operate against differential pressure.
Published: (1981)
Published: (1981)
Vibration-induced degradation and failure of safety-related valves.
Published: (2006)
Published: (2006)
Degradation or loss of charging systems at PWR nuclear power plants using swing-pump designs.
Published: (1986)
Published: (1986)
Rosemount differential pressure transmitter zero point shift.
Published: (1985)
Published: (1985)
Main steam safety valve setpoint variation as a result of thermal effects.
Published: (1996)
Published: (1996)
Safety evaluation of Westinghouse topical reports dealing with elimination of postulated pipe breaks in PWR primary main loops.
Published: (1984)
Published: (1984)
Malfunction of a pressurized code safety valve.
Published: (1993)
Published: (1993)
Availability of NUREG-1169, "Technical findings related to Generic Issue C-8; boiling water reactor main steam isolation valve leakage and leakage treatment methods".
Published: (1986)
Published: (1986)
Testing and operations-induced degradation of 3-stage Target Rock safety/relief valves.
Published: (2018)
Published: (2018)
Potential problems with Crosby safety relief valves used on diesel generator air start receiver tanks.
Published: (1990)
Published: (1990)
RELAP5/MOD3 assessment for calculation of safety and relief valve discharge piping hydrodynamic loads /
by: Stubbe, E. J. (Elie J.), et al.
Published: (1994)
by: Stubbe, E. J. (Elie J.), et al.
Published: (1994)
Cracking of valves in the condensate return lines of a BWR emergency condensation system.
Published: (1992)
Published: (1992)
Reduction of reactor coolant inventory because of misalignment of RHR valves.
Published: (1986)
Published: (1986)
Inadvertent containment spray due to personnel error.
Published: (1981)
Published: (1981)
Failure to close service water cross-connect isolation valves.
Published: (1989)
Published: (1989)
Breach of containment integrity.
Published: (1979)
Published: (1979)
Primary containment isolation valve discrepancies.
Published: (1983)
Published: (1983)
Containment purging and venting during normal operation--guidelines for valve operability.
Published: (1979)
Published: (1979)