Degradation or loss of charging systems at PWR nuclear power plants using swing-pump designs.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Inspection and Enforcement,
1986.
|
| Series: | Information notice ;
no. 86-79. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo148296 |
Similar Items
Complete loss of main and auxiliary feedwater at a PWR designed by Babcock & Wilcox.
Published: (1985)
Published: (1985)
PWR auxiliary feedwater pump turbine control problems.
Published: (1986)
Published: (1986)
PWR auxiliary feedwater pump turbine overspeed trip failure.
Published: (1988)
Published: (1988)
Degradation of reactor coolant pump studs.
Published: (1980)
Published: (1980)
Potential for common-mode failure of high pressure safety injection pumps or release of reactor coolant outside containment during a loss-of-coolant accident.
Published: (1990)
Published: (1990)
Potential for gas binding of high-pressure safety injection pumps during a loss-of-coolant accident.
Published: (1988)
Published: (1988)
Main feedwater system degradation in safety-related ASME code class 2 piping inside the containment of a pressurized water reactor.
Published: (2001)
Published: (2001)
Assessment of the "one feedwater pump trip transient" in Cofrentes Nuclear Power Plant with TRAC-BF1 /
by: Castrillo, F., et al.
Published: (1992)
by: Castrillo, F., et al.
Published: (1992)
Steam binding of auxiliary feedwater pumps.
Published: (1984)
Published: (1984)
Charging pump trip during a loss-of-coolant event caused by low suction pressure.
Published: (1994)
Published: (1994)
Stress corrosion cracking in PWR steam generator tubes.
Published: (1990)
Published: (1990)
Pipe cracks in stagnant borated water systems at PWR plants.
Published: (1979)
Published: (1979)
Steam generator tube ruptures at two PWR facilities.
Published: (1979)
Published: (1979)
Safety evaluation of Westinghouse topical reports dealing with elimination of postulated pipe breaks in PWR primary main loops.
Published: (1984)
Published: (1984)
Failures of reactor coolant pump thermal barriers and check valves in foreign plants.
Published: (1997)
Published: (1997)
Overspeed of the turbine-driven auxiliary feedwater pumps and overpressurization of the associated piping systems.
Published: (1990)
Published: (1990)
Monitoring vibration to detect circumferential cracking of reactor coolant pump and reactor recirculation pump shafts.
Published: (2005)
Published: (2005)
Temporary strainers left installed in pump suction piping.
Published: (1985)
Published: (1985)
RHR valve misalignment causes degradation of ECCS in PWRS.
Published: (1987)
Published: (1987)
Unit startup with degraded high pressure safety injection system.
Published: (1986)
Published: (1986)
Loss of thermal sleeves in reactor coolant system piping at certain Westinghouse Pwr power plants.
Published: (1982)
Published: (1982)
Potential loss of effective volume for containment recirculation spray at PWR facilities.
Published: (1990)
Published: (1990)
EB 80-04 analysis of a PWR main steam sine break with continued feedwater addition.
Published: (1980)
Published: (1980)
Pump shaft damage due to excessive hardness of shaft sleeve generator tubes.
Published: (2002)
Published: (2002)
Disablement of turbine-driven auxiliary feedwater pump due to closure of one of the parallel steam supply valves.
Published: (1989)
Published: (1989)
Additional guidance on "Potential for low fracture toughness and lamellar tearing on PWR steam generator and reactor coolant pump supports".
Published: (1980)
Published: (1980)
Recent problems with service water systems.
Published: (1990)
Published: (1990)
PWR low temperature overpressure protection.
Published: (1982)
Published: (1982)
Loss of high head safety injection.
Published: (1992)
Published: (1992)
Failure of auxiliary feedwater manual isolation valve.
Published: (1986)
Published: (1986)
Significant unexpected erosion of feedwater lines.
Published: (1987)
Published: (1987)
Resolution of generic safety issue 93, "Steam binding of auxiliary feedwater pumps".
Published: (1988)
Published: (1988)
New information regarding insulation material performance and debris blockage of PWR containment sumps.
Published: (1990)
Published: (1990)
Cracking in charging pump casing cladding.
Published: (1980)
Published: (1980)
Survey of feed pump outages /
Published: (1978)
Published: (1978)
Spatial effects and uncertainty analysis for rod ejection accidents in a PWR /
by: Avvakumov, A., et al.
Published: (2007)
by: Avvakumov, A., et al.
Published: (2007)
Overexposures in PWR cavities.
Published: (1982)
Published: (1982)
Overpressurization of containment of a PWR plant after a main steam line break.
Published: (1979)
Published: (1979)
Effects of degradation on the severe accident consequences for a PWR plant with a reinforced concrete containment vessel /
by: Petti, J. P.
Published: (2013)
by: Petti, J. P.
Published: (2013)
Unisolable crack in high-pressure injection piping.
Published: (1997)
Published: (1997)