Failure to close service water cross-connect isolation valves.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,
1989.
|
| Series: | Information notice ;
no, 89-49. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo151098 |
Similar Items
LWR primary coolant system pressure isolation valves.
Published: (1980)
Published: (1980)
RCIC and HPCI turbine exhaust check valve failures.
Published: (1982)
Published: (1982)
Reduction of reactor coolant inventory because of misalignment of RHR valves.
Published: (1986)
Published: (1986)
Thermally induced pressure locking of a high pressure coolant injection valve.
Published: (1996)
Published: (1996)
Suceptibility of low-pressure coolant injection and core spray injection valves to pressure locking.
Published: (1995)
Published: (1995)
Leaking shutdown cooling isolation valves at Cooper Nuclear Station.
Published: (1994)
Published: (1994)
RHR valve misalignment causes degradation of ECCS in PWRS.
Published: (1987)
Published: (1987)
Corrosion of valve-to-torque tube keys in spray pond cross connect valves.
Published: (1990)
Published: (1990)
Primary containment isolation valve discrepancies.
Published: (1983)
Published: (1983)
Main steam isolation valve guide rail failure at Waterford Unit 3.
Published: (1988)
Published: (1988)
Loss of shutdown cooling during disassembly of high pressure safety injection system check valve.
Published: (1991)
Published: (1991)
Boiling water reactor safety/relief valve failures.
Published: (1983)
Published: (1983)
Failures of main steam isolation valves.
Published: (1988)
Published: (1988)
Valve stem corrosion failures.
Published: (1985)
Published: (1985)
Failure of a boiling water reactor target rock main steam safety/relief valve.
Published: (2003)
Published: (2003)
Main steam isolation valve failure to close on demand because of inadequate maintenance and testing.
Published: (1994)
Published: (1994)
Main steam isolation valve closure logic.
Published: (1985)
Published: (1985)
Failure of Rockwell-Edward main steam isolation valves.
Published: (1981)
Published: (1981)
Inadequate inservice testing of main steam isolation valves.
Published: (1985)
Published: (1985)
Failure of elastomer seated butterfly valves used only during cold shutdowns.
Published: (1984)
Published: (1984)
Locking devices inadequately installed on main steam isolation valves.
Published: (1981)
Published: (1981)
Direction-dependent leak characteristics of containment purge valves.
Published: (1988)
Published: (1988)
Failures to identify containment leakage due to inadequate local testing of BWR vacuum relief system valves.
Published: (1986)
Published: (1986)
Failure of auxiliary feedwater manual isolation valve.
Published: (1986)
Published: (1986)
Main steam isolation valve failure events.
Published: (2015)
Published: (2015)
Failures of main steam isolation check valves resulting in disc separation.
Published: (1990)
Published: (1990)
Failure of main steam isolation valves as a result of sticking solenoid pilot valves.
Published: (1995)
Published: (1995)
Check valve failures.
Published: (1981)
Published: (1981)
Containment purging and venting during normal operation--guidelines for valve operability.
Published: (1979)
Published: (1979)
Failure of air check valves to seat.
Published: (1985)
Published: (1985)
Failures of scram discharge volume vent and drain valves.
Published: (1986)
Published: (1986)
Periodic verification of leak tight integrity of pressure isolation valves.
Published: (1987)
Published: (1987)
Common mode failure of main steam isolation nonreturn check valves.
Published: (1983)
Published: (1983)
Instrument failure causes opening of PORV and block valve.
Published: (1980)
Published: (1980)
Motor-operated valve failures due to hammering effect.
Published: (1985)
Published: (1985)
Failures of nut-locking devices in check-valves.
Published: (1993)
Published: (1993)
Failures of Rockwell International globe valves.
Published: (1984)
Published: (1984)
Valve-stem failure caused by embrittlement.
Published: (1992)
Published: (1992)
Availability of NUREG-1169, "Technical findings related to Generic Issue C-8; boiling water reactor main steam isolation valve leakage and leakage treatment methods".
Published: (1986)
Published: (1986)
Failures of motor-operated valves due to degraded stem lubricant.
Published: (2010)
Published: (2010)