Inadequate dedication process for commercial-grade components which could lead to common mode failure of a safety system.
| Format: | Government Document eBook |
|---|---|
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,
1989.
|
| Series: | Information notice ;
no. 89-14. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo150899 |
Similar Items
Recent issues related to the qualification and commercial grade dedication of safety-related components.
Published: (2014)
Published: (2014)
Licensee commercial-grade procurement and dedication programs.
Published: (1991)
Published: (1991)
Commercial-grade structural framing components supplied as nuclear safety-related equipment.
Published: (1991)
Published: (1991)
Inadequate quality assurance program of vendor supplying safety-related equipment.
Published: (1991)
Published: (1991)
NRC Public Workshop on Commercial Grade Procurement and Dedication.
Published: (1993)
Published: (1993)
Deficient electrical terminations identified in safety-related components.
Published: (1988)
Published: (1988)
Inappropriate application of commercial-grade components.
Published: (1987)
Published: (1987)
Inadequate environment control for components and systems in extended storage or layup.
Published: (1985)
Published: (1985)
Potential problems caused by single failure of an engineered safety feature swing bus.
Published: (1988)
Published: (1988)
Common-cause failures due to inadequate design control and dedication.
Published: (1994)
Published: (1994)
Recent issues related to the commercial grade dedication of Allen Bradley 700-RTC relays.
Published: (2016)
Published: (2016)
Inadequate testing to detect failures of safety-related pneumatic components or systems.
Published: (1986)
Published: (1986)
Inadequate fuse control programs.
Published: (1991)
Published: (1991)
Apparently improper use of commercial grade components in safety-related systems.
Published: (1983)
Published: (1983)
Unaccounted for error terms associated with the irradiation testing and environmental qualification of important-to-safety components.
Published: (2015)
Published: (2015)
Inadequate testing of emergency bus undervoltage logic circuitry.
Published: (1992)
Published: (1992)
Inadequate testing of relay contacts in safety-related logic systems.
Published: (1988)
Published: (1988)
Commercial-grade dedication issues identified during NRC inspections.
Published: (2011)
Published: (2011)
Inadequate testing of emergency diesel generators (EDGs).
Published: (1991)
Published: (1991)
Improperly installed instrumentation, inadequate quality control and inadequate postmodification testing.
Published: (1985)
Published: (1985)
Recent issues identified when using reverse engineering techniques in the procurement of safety-related components.
Published: (2016)
Published: (2016)
Removal of component lists from technical specifications.
Published: (1991)
Published: (1991)
Probabilities of failure and uncertainty estimate information for passive components : a literature review /
Published: (2007)
Published: (2007)
Deficiencies in failure modes and effects analyses for instrumentation and control systems.
Published: (1997)
Published: (1997)
Component failures caused by elevated DC control voltage.
Published: (1983)
Published: (1983)
Vibration-induced valve failures.
Published: (1983)
Published: (1983)
Recent snubber inservice testing with high failure rates.
Published: (1984)
Published: (1984)
Inadequate physical separation and electrical isolation of non-safety-related circuits from reactor protection system circuits.
Published: (1991)
Published: (1991)
Potential circuit failure-induced secondary fires or equipment damage.
Published: (2014)
Published: (2014)
Failures of the undervoltage, trip function of reactor trip system breakers.
Published: (1983)
Published: (1983)
Licensee event reports containing information pertaining to defects in basic components.
Published: (2011)
Published: (2011)
Environmental qualification of safety-related equipment.
Published: (1980)
Published: (1980)
Qualification of safety related electrical equipment.
Published: (1980)
Published: (1980)
Anchorage and support of safety-related electrical equipment.
Published: (1980)
Published: (1980)
Environmental qualification of safety-related electrical equipment.
Published: (1982)
Published: (1982)
Failure of condensate piping because of erosion-corrosion at a flow-straightening device.
Published: (1995)
Published: (1995)
Software for computer based systems important to safety in nuclear power plants : Safety guide /
Published: (2000)
Published: (2000)
Orders on environmental qualification of safety related electrical equipment.
Published: (1980)
Published: (1980)
Inadvertent loss or improper actuation of safety-related equipment.
Published: (1985)
Published: (1985)
Problems with liquid nitrogen cooling components below the nil ductility temperature.
Published: (1984)
Published: (1984)