Credit for control rods without scram capability in the calculation of the shutdown margin.
| Corporate Author: | U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation |
|---|---|
| Format: | Government Document eBook |
| Language: | English |
| Published: |
Washington, D.C. :
United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,
1989.
|
| Series: | Information notice ;
89-09. |
| Subjects: | |
| Online Access: | https://purl.fdlp.gov/GPO/gpo150893 |
Similar Items
Inadequate shutdown margins.
Published: (1984)
Published: (1984)
Effects of crud buildup and boron deposition on power distribution and shutdown margin.
Published: (1997)
Published: (1997)
Optimal shutdown control of nuclear reactors /
Published: (1966)
Published: (1966)
Inadvertent control rod withdrawal event while shutdown.
Published: (2010)
Published: (2010)
Potential loss of safe shutdown equipment due to premature silicon controlled rectifier failure.
Published: (1988)
Published: (1988)
Potential for loss of remote shutdown capability during a control room fire.
Published: (1992)
Published: (1992)
Failure of remote shutdown system instrumentation because of incorrectly installed components.
Published: (1991)
Published: (1991)
Potential loss of required shutdown margin during refueling operations.
Published: (1989)
Published: (1989)
Failure to ensure that post-fire shutdown procedures can be performed.
Published: (2010)
Published: (2010)
Careful planning significantly reduces the potential adverse impacts of loss of offsite power events during shutdown.
Published: (1991)
Published: (1991)
Inadequate control of reactor coolant system conditions during shutdown.
Published: (1993)
Published: (1993)
Degradation of shutdown cooling system performance.
Published: (1993)
Published: (1993)
Loss of shutdown cooling during disassembly of high pressure safety injection system check valve.
Published: (1991)
Published: (1991)
Recent events involving reactor coolant system inventory control during shutdown.
Published: (1997)
Published: (1997)
Unplanned return to criticality during reactor shutdown.
Published: (1992)
Published: (1992)
Leaking shutdown cooling isolation valves at Cooper Nuclear Station.
Published: (1994)
Published: (1994)
Risk impact study regarding maintenance during low-power operation and shutdown.
Published: (1995)
Published: (1995)
Shutdown order issued because licensed operators asleep while on duty.
Published: (1987)
Published: (1987)
Observations from recent shutdown risk and outage management pilot team inspections.
Published: (1993)
Published: (1993)
Failure of elastomer seated butterfly valves used only during cold shutdowns.
Published: (1984)
Published: (1984)
Partial bypass of shutdown cooling flow from the reactor vessel.
Published: (1996)
Published: (1996)
Scram discharge volume.
Published: (1980)
Published: (1980)
Inaccurate reactor water level indication and inadvertent draindown during shutdown.
Published: (1996)
Published: (1996)
Improper electrical grounding results in simultaneous fires in the control room and safe-shutdown equipment room.
Published: (1997)
Published: (1997)
Scram discharge volume designs.
Published: (1980)
Published: (1980)
Unrecognized reactivity addition during plant shutdown.
Published: (1997)
Published: (1997)
Level instrumentation inaccuracies observed during normal plant depressurization.
Published: (1993)
Published: (1993)
Potential for loss of shutdown cooling while at low reactor coolant levels.
Published: (1990)
Published: (1990)
Lessons learned from NRC inspections of fire protection SafeShutdown systems (10 CFR 50, Appendix R).
Published: (1984)
Published: (1984)
Recent operating experience on loss of reactor coolant inventory while In a shutdown condition.
Published: (1990)
Published: (1990)
Turbine overspeed and reactor cooldown during shutdown evaluation.
Published: (1994)
Published: (1994)
Thermal sleeve flange wear leads to stuck control rod at foreign nuclear plant.
Published: (2018)
Published: (2018)
Undetected accumulation of gas in reactor coolant system and inaccurate reactor water level indication during shutdown.
Published: (1996)
Published: (1996)
Inadvertent reduction in primary coolant inventory in boiling water reactors during shutdown and startup.
Published: (1984)
Published: (1984)
Outage planning and scheduling--impacts on risk.
Published: (2005)
Published: (2005)
Regulatory requirements when no operations are being performed.
Published: (1994)
Published: (1994)
Safe shutdown potentially challenged by unanalyzed internal flooding events and inadequate design.
Published: (2005)
Published: (2005)
Degradation of residual heat removal (RHR) system.
Published: (1981)
Published: (1981)
Framework for low power/shutdown fire PRA : final report /
by: Nowlen, S. P., et al.
Published: (2013)
by: Nowlen, S. P., et al.
Published: (2013)
Methodology for low power/shutdown fire PRA : draft report for comment /
by: Nowlen, S. P.
by: Nowlen, S. P.